Construction Update- 8/16/2024

PLEASE consistently check your front door daily for time sensitive notifications. All updates below are scheduled for the week of 8/19 and are WEATHER PERMITTING.


Traffic Update

  • A map visualizing this traffic update can be found here.



W 64th St, Millers Ln, Rose Ct

  • Excavation in preparation for topsoil is occurring sporadically.
  • Check your front door daily for notification of temporary driveway access or water loss.
  • Watermain lining at the intersection of W 64th St / Ashcroft Ln is scheduled for the week of 8/19. Please use alternate routes.



Concord Ave, Ashcroft Ln, W. 63rd St, St. Johns Ave (South of Garrison Ln), Virginia Ln

  • Excavation in preparation for topsoil and retaining walls is occurring sporadically.
  • Irrigation repairs continue on Concord Ave. Dave’s Irrigation will begin doing irrigation repairs on the remainder of the streets.
  • Please continue to park vehicles in driveways to prevent construction interruptions.
  • Check your front door daily for notification of temporary driveway access or water loss.



Garrison Ln, Nancy Ln, Wooddale Ave

  • Removal and replacement of poor soils in preparation for curb and gutter will continue.
  • Curb and gutter installation is tentatively scheduled for 8/23.
  • Check your front door daily for notification of temporary driveway access or water loss.



W. 62nd St, Ashcroft Ave, St. Johns Ave (North of Garrison Ln)

  • Installation of the new watermain continues.
  • Check your front door daily for notification of temporary driveway access or water loss.


Please set out your garbage and recycling containers before 6 AM. We have encouraged haulers to arrive early to avoid conflicts with the contractor and their operations.