Construction Update- 8/16/2024
PLEASE consistently check your front door daily for time sensitive notifications. All updates below are scheduled for the week of 8/19 and are WEATHER PERMITTING.
Traffic Update
- A map visualizing this traffic update can be found here.
W 64th St, Millers Ln, Rose Ct
- Excavation in preparation for topsoil is occurring sporadically.
- Check your front door daily for notification of temporary driveway access or water loss.
- Watermain lining at the intersection of W 64th St / Ashcroft Ln is scheduled for the week of 8/19. Please use alternate routes.
Concord Ave, Ashcroft Ln, W. 63rd St, St. Johns Ave (South of Garrison Ln), Virginia Ln
- Excavation in preparation for topsoil and retaining walls is occurring sporadically.
- Irrigation repairs continue on Concord Ave. Dave’s Irrigation will begin doing irrigation repairs on the remainder of the streets.
- Please continue to park vehicles in driveways to prevent construction interruptions.
- Check your front door daily for notification of temporary driveway access or water loss.
Garrison Ln, Nancy Ln, Wooddale Ave
- Removal and replacement of poor soils in preparation for curb and gutter will continue.
- Curb and gutter installation is tentatively scheduled for 8/23.
- Check your front door daily for notification of temporary driveway access or water loss.
W. 62nd St, Ashcroft Ave, St. Johns Ave (North of Garrison Ln)
- Installation of the new watermain continues.
- Check your front door daily for notification of temporary driveway access or water loss.
Please set out your garbage and recycling containers before 6 AM. We have encouraged haulers to arrive early to avoid conflicts with the contractor and their operations.