PLEASE consistently check your front door daily for time sensitive notifications. All updates below are scheduled for the week of 8/5 and are WEATHER PERMITTING.
Traffic Update
- A map visualizing this traffic update can be found here.
Millers Ln, and Rose Ct
- Excavation in preparation for topsoil is occurring sporadically.
W 64th St
- Sidewalk installation west of Ashcroft Ln.
Concord Ave
- Excavation in preparation for topsoil and retaining walls is occurring sporadically.
- Irrigation repairs continue.
- Please continue to park vehicles in driveways to prevent construction interruptions.
- Check your front door daily for notification of temporary driveway access or water loss.
Ashcroft Ln, W. 63rd St, St. Johns Ave (South of Garrison Ln), Virginia Ln
- Driveway access restoration will occur.
- Concrete curb will continue Monday, 8/5 on Ashcroft Ln and St Johns Ave
- Roadway preparation for asphalt paving.
- The first layer of asphalt paving is tentatively scheduled for Friday, 8/9.
- Check your front door daily for notification of temporary driveway access or water loss.
Garrison Ln, Nancy Ln, and Wooddale Ave
- Installation of the new water services will continue.
- Check your front door daily for notification of temporary driveway access or water loss.
W. 62nd St, Ashcroft Ave, St. Johns Ave (North of Garrison Ln)
- Temporary water setup in preparation for water main replacement will continue.
- The Contractor will send out notifications to coordinate a time to connect homes to temporary water.
Please set out your garbage and recycling containers before 6 AM. We have encouraged haulers to arrive early to avoid conflicts with the contractor and their operations.
Share Construction Update- 8/2/2024 on Facebook
Share Construction Update- 8/2/2024 on Twitter
Share Construction Update- 8/2/2024 on Linkedin
Email Construction Update- 8/2/2024 link