Turf Restoration and Watering - 9/2/2022
The contractor is scheduled to resume turf restoration rework on Hansen Road and Windsor Avenue on Tues. 9/6. Following this work, additional topsoil will be added to low areas as necessary, including leveling and seeding.
The City has directed the contractor to water the seed daily, per the City’s specifications. This is scheduled to begin on Tues. 9/6.
We encourage residents to help keep the grass moist. See the following post for details.
Share on Facebook
Share on Twitter
Share on Linkedin
Email this link
Consultation has concluded