Share 7000 York Ave on FacebookShare 7000 York Ave on TwitterShare 7000 York Ave on LinkedinEmail 7000 York Ave link
This variance was approved at the September 13, 2023 Planning Commission meeting.
This variance was approved at the Planning Commission on September 13, 2023.
Black & Veatch, on behalf of Target and Electrify America, requests a variance to place a 750 KVA Utility Transformer within the front setback at Target’s location at 7000 York Ave S, Edina, MN 55435. EA leases space in the parking lot where EA intends to install six (6) 350kw electric vehicle dispensers. Electrify America will own and maintain all EV equipment and infrastructure including the dispensers, conduit, power units and switchboard assembly. Xcel Energy will retain ownership of the newly installed utility transformer and they will be responsible for its maintenance.
This variance was approved at the Planning Commission on September 13, 2023.
Black & Veatch, on behalf of Target and Electrify America, requests a variance to place a 750 KVA Utility Transformer within the front setback at Target’s location at 7000 York Ave S, Edina, MN 55435. EA leases space in the parking lot where EA intends to install six (6) 350kw electric vehicle dispensers. Electrify America will own and maintain all EV equipment and infrastructure including the dispensers, conduit, power units and switchboard assembly. Xcel Energy will retain ownership of the newly installed utility transformer and they will be responsible for its maintenance.