It's All Coming Together

about 2 months ago

The streets are paved, topsoil and seed are in, and all major items are complete.

There are various items throughout the project area that still require attention. Some of these remaining items include landscaping, irrigation repairs, grading of lawns along driveways and alleys.

I will walk the project area during the week of October 21 to prepare the remaining work items list. If you would like to bring something specific to my attention, please email me your address, the issue, and the specific location. If possible, pictures are helpful.

The seeded areas will be monitored on a weekly basis to ensure proper turf establishment. Seed installed in Fall 2019 will be monitored into Spring 2020. Please refrain from disturbing any of the seeded areas and do not apply any fertilizers, herbicides or pesticides until Spring of 2020.