Indian Trails B & C Neighborhood Roadway Reconstruction

Indian Trails B & C Neighborhood Roadway Reconstruction updates will be hosted on this project page. Check back for updates!

This project includes complete reconstruction of the pavement, new concrete curb and gutter on Bello Drive, Overholt Pass and Shawnee Circle; spot replacement of curb and gutter on all other streets and improvements to the watermain, sanitary sewer and storm sewer systems.


Indian Trails B & C Neighborhood Roadway Reconstruction updates will be hosted on this project page. Check back for updates!

This project includes complete reconstruction of the pavement, new concrete curb and gutter on Bello Drive, Overholt Pass and Shawnee Circle; spot replacement of curb and gutter on all other streets and improvements to the watermain, sanitary sewer and storm sewer systems.


  • Construction Update & Road Closure Information

    7 months ago

    Sally Lane - Storm sewer improvements began on May 1 at the corner Sally and Paiute Pass. They will continue installing storm sewer on May 2. Crews have installed the sump line between Valley View Road and Paiute Pass and will continue installing the sump line north of Paiute Pass.

    Paiute Circle/Drive/Pass - Water main improvements are nearly complete. On May 2 the crew will connect the new main to the existing main at Paiute Drive and Paiute Pass. All new water main will be flushed and tested prior to beginning connections to homes. Later next week crews will begin...

    Sally Lane - Storm sewer improvements began on May 1 at the corner Sally and Paiute Pass. They will continue installing storm sewer on May 2. Crews have installed the sump line between Valley View Road and Paiute Pass and will continue installing the sump line north of Paiute Pass.

    Paiute Circle/Drive/Pass - Water main improvements are nearly complete. On May 2 the crew will connect the new main to the existing main at Paiute Drive and Paiute Pass. All new water main will be flushed and tested prior to beginning connections to homes. Later next week crews will begin making water service connections to the new water main.

    Dakota Trail Road Closure – Dakota Trail will be closed at the intersection of Shawnee Circle beginning 8:00 A.M. Thursday, May 2 for water main upgrades and will remain closed until 9:00 P.M. Friday, May 3. Local traffic will still be allowed to travel along Dakota Trail north or south of Shawnee Circle. Shawnee Circle and Overholt Pass property owners will have access to Dakota Trail during water main work.

  • Construction Update

    8 months ago

    The week of April 29th:

    Bello Drive - Early next week crews will replace the old hydrant between 25 and 17 Bello Drive.

    Water Shutoff Reminder:

    For affected homes. If you feel you will need water during the shutoff, you can fill your bathtub with water for hand washing and to fill up the back of your toilet for flushing. We also recommend filling a couple of pitchers or jugs of water to keep on hand for cooking or drinking.

    Comanche Court - Late in the week crews will begin installing sump line following completion on Sally Lane. This work...

    The week of April 29th:

    Bello Drive - Early next week crews will replace the old hydrant between 25 and 17 Bello Drive.

    Water Shutoff Reminder:

    For affected homes. If you feel you will need water during the shutoff, you can fill your bathtub with water for hand washing and to fill up the back of your toilet for flushing. We also recommend filling a couple of pitchers or jugs of water to keep on hand for cooking or drinking.

    Comanche Court - Late in the week crews will begin installing sump line following completion on Sally Lane. This work will require sporadic pits dug behind the curb line to get drilling equipment in. Please have your contractor contact me if you plan on connecting to the sump line.

    Overholt Pass & Shawnee Court - Tuesday crews will begin digging to make room for equipment to replace the water main on Overholt Pass. The new watermain will be installed primarily via trenchless method on Wednesday. Work for Shawnee watermain is tentatively scheduled for Thursday. Please check back for updates on Shawnee and Dakota watermain work

    Sally Lane - A closure of the intersection of Sally Lane and Paiute Pass is scheduled for Wednesday to install new storm structures. Sump installation is scheduled to begin starting on the east side of Sally Lane. This work will require sporadic pits dug behind the curb line to get drilling equipment in. Please have your contractor contact me if you plan on connecting to the sump line.

    Paiute Circle - All homes should be connected to temporary water. If you are not please contact me. Early next week crews will begin drilling in new watermain. Please continue to check front doors for any construction notices.

    Paiute Drive - The watermain on Paiute Drive south of Paiute Circle will be replaced early next week. Tuesday the road will be inaccessible during the day at Paiute Drive & Paiute Pass as well as at Paiute Drive & Paiute Circle to prepare for this work. Please continue to check front doors for any construction notices.

    Paiute Pass - Tuesday crews will be utilizing a majority of the road near Paiute Drive for watermain work. Wednesday Paiute Pass at Sally Lane will be inaccessible due to storm sewer improvements. Please continue to check front doors for any construction notices.

    Your continued cooperation during construction is appreciated. Thank you.

  • Bello Drive, Paiute Pass, and Sally Lane Water Shut Off

    8 months ago

    Tomorrow Friday, April 26 there will be a water shut off affecting houses on Bello Drive, Paiute Pass, and Sally Lane. The work will consist of installing new hydrants on Bello Drive and Paiute Pass, and removing an old isolation valve on Paiute Pass. Please check your front door for a bright orange notice indicating the time and duration of the water shut off.

    Water Shutoff Reminder:

    For affected homes. If you feel you will need water during the shutoff, you can your bathtub with water for hand washing and to fill up the back of your toilet for flushing....

    Tomorrow Friday, April 26 there will be a water shut off affecting houses on Bello Drive, Paiute Pass, and Sally Lane. The work will consist of installing new hydrants on Bello Drive and Paiute Pass, and removing an old isolation valve on Paiute Pass. Please check your front door for a bright orange notice indicating the time and duration of the water shut off.

    Water Shutoff Reminder:

    For affected homes. If you feel you will need water during the shutoff, you can your bathtub with water for hand washing and to fill up the back of your toilet for flushing. We also recommend filling a couple of pitchers or jugs of water to keep on hand for cooking or drinking.


  • Water Shut Off, Valve & Hydrant Replacements

    8 months ago

    Tomorrow Thursday, April 25 there will be a water shut off affecting houses on Comanche Court, Paiute Circle, Paiute Drive, and Paiute Pass. The work will consist of installing new isolation valves on Paiute Pass and Paiute Drive. There will also be a new fire hydrant installed between 6608 & 6612 Paiute Pass. Please check your front door for a bright orange notice indicating the time and duration of the water shut off.

    Water Shutoff Reminder:

    For affected homes. If you feel you will need water during the shutoff, you can your bathtub with water for hand washing and to...

    Tomorrow Thursday, April 25 there will be a water shut off affecting houses on Comanche Court, Paiute Circle, Paiute Drive, and Paiute Pass. The work will consist of installing new isolation valves on Paiute Pass and Paiute Drive. There will also be a new fire hydrant installed between 6608 & 6612 Paiute Pass. Please check your front door for a bright orange notice indicating the time and duration of the water shut off.

    Water Shutoff Reminder:

    For affected homes. If you feel you will need water during the shutoff, you can your bathtub with water for hand washing and to fill up the back of your toilet for flushing. We also recommend filling a couple of pitchers or jugs of water to keep on hand for cooking or drinking.


  • Water Shut Off & Hydrant Replacement

    8 months ago

    In addition to work in update posted below...

    There will be a water shut off for Comanche Court water main work. The contractor will be replacing the hydrant on Comanche Court on Wednesday April 24. This work is scheduled to start at 8:00 and last up to 8 hours.

    Water Shutoff Reminder:

    For affected homes. If you feel you will need water during the shutoff, you can your bathtub with water for hand washing and to fill up the back of your toilet for flushing. We also recommend filling a couple of pitchers or jugs of water to keep on...

    In addition to work in update posted below...

    There will be a water shut off for Comanche Court water main work. The contractor will be replacing the hydrant on Comanche Court on Wednesday April 24. This work is scheduled to start at 8:00 and last up to 8 hours.

    Water Shutoff Reminder:

    For affected homes. If you feel you will need water during the shutoff, you can your bathtub with water for hand washing and to fill up the back of your toilet for flushing. We also recommend filling a couple of pitchers or jugs of water to keep on hand for cooking or drinking.


  • Water Shut Off & Hydrant Replacements

    8 months ago

    There will be another water shut off tomorrow Wednesday April 24 for work on the water main. The work will consist of installing a new fire hydrant on Sally Lane between 6833 and 6837, and new water valves on Sally Lane and Paiute Pass. The water shut off will start at 8:00. The contractor anticipates the work will take 10 hours to complete.

    Water Shutoff Reminder:

    For affected homes. If you feel you will need water during the shutoff, you can your bathtub with water for hand washing and to fill up the back of your toilet for flushing. We...

    There will be another water shut off tomorrow Wednesday April 24 for work on the water main. The work will consist of installing a new fire hydrant on Sally Lane between 6833 and 6837, and new water valves on Sally Lane and Paiute Pass. The water shut off will start at 8:00. The contractor anticipates the work will take 10 hours to complete.

    Water Shutoff Reminder:

    For affected homes. If you feel you will need water during the shutoff, you can your bathtub with water for hand washing and to fill up the back of your toilet for flushing. We also recommend filling a couple of pitchers or jugs of water to keep on hand for cooking or drinking.


  • Construction Update

    8 months ago

    With today's rain, the water shut off work will be moved to tomorrow, Tuesday, April 23rd.

    With today's rain, the water shut off work will be moved to tomorrow, Tuesday, April 23rd.

  • Construction Update

    8 months ago

    The week of April 22nd crews will be replacing water valves and hydrants on Sally Lane and Paiute Drive. This work will be taking place Monday and Tuesday weather dependent. If your home is affected by the water shutoff for this work, there will be a notice left at your front door. Homes receiving temporary water on Paiute Circle, Paiute Drive, and Paiute Pass will be connected to upon completion of water main work on Sally Lane.

    Water Shutoff Reminder:

    For affected homes. If you feel you will need water during the shutoff, you can your bathtub with water for...

    The week of April 22nd crews will be replacing water valves and hydrants on Sally Lane and Paiute Drive. This work will be taking place Monday and Tuesday weather dependent. If your home is affected by the water shutoff for this work, there will be a notice left at your front door. Homes receiving temporary water on Paiute Circle, Paiute Drive, and Paiute Pass will be connected to upon completion of water main work on Sally Lane.

    Water Shutoff Reminder:

    For affected homes. If you feel you will need water during the shutoff, you can your bathtub with water for hand washing and to fill up the back of your toilet for flushing. We also recommend filling a couple of pitchers or jugs of water to keep on hand for cooking or drinking.

    Sump line installation will begin Tuesday 4/23. Crews will begin work on Sally Lane by digging small pits for their equipment. They will be drilling in the sump line at the back of curb to minimize yard disturbance. If you would like to connect your home to the sump line please reach out to me to discuss and coordinate.


  • Water Shutoff & Hydrant Replacements

    8 months ago
    Water shutoff notice

    Water shutoffs will begin tomorrow for work on the water main. The contractor will be installing a new fire hydrant at the corner of Paiute Pass and Sally Lane, and on Sally Lane between 7013 and 7017. We are anticipating the work will take 10 hours to complete. To prepare for the water shut off we recommend filling your bathtub with water for hand washing and so you can fill up the back of your toilet to flush it. We also recommend filling a couple of pitchers or jugs of water to keep on hand for cooking or drinking. In...

    Water shutoffs will begin tomorrow for work on the water main. The contractor will be installing a new fire hydrant at the corner of Paiute Pass and Sally Lane, and on Sally Lane between 7013 and 7017. We are anticipating the work will take 10 hours to complete. To prepare for the water shut off we recommend filling your bathtub with water for hand washing and so you can fill up the back of your toilet to flush it. We also recommend filling a couple of pitchers or jugs of water to keep on hand for cooking or drinking. In the event work finishes early water will be turned on at that point. Homes affected by the water shut off will have an orange notice at their front door (see picture).


  • Construction Update

    8 months ago

    The week of April 15, crews will continue to set up and fill temporary water lines on Paiute Circle, Paiute Drive and Paiute Pass. If your home is to be connected crews will be contacting you to schedule a time to come in and shut off your water meter to get you hooked up. The temp water will be tested for bacteria prior to connecting to homes. If your home is staged to be connected to temp water, please turn on and test your outside hose bib to make sure it is working properly.

    Starting Monday April 15th,...

    The week of April 15, crews will continue to set up and fill temporary water lines on Paiute Circle, Paiute Drive and Paiute Pass. If your home is to be connected crews will be contacting you to schedule a time to come in and shut off your water meter to get you hooked up. The temp water will be tested for bacteria prior to connecting to homes. If your home is staged to be connected to temp water, please turn on and test your outside hose bib to make sure it is working properly.

    Starting Monday April 15th, vibration monitors will be placed at various locations around the project. These are small boxes used to measure vibration during the project. Please do not move these and inform any landscaping or maintenance crews to leave them in place.

    Prior to any digging, crews will be placing erosion control devices in existing storm sewer catch basins. These are designed to catch sediment and will remain in place until construction is complete.

    Crews are tentatively scheduled to start installing sump lines Friday the 19th. Sump lines will be installed on the East side of Sally Lane, Paiute Circle, Paiute Drive, Paiute Pass and Comanche Court. If you would like to tie into the sump line please have your contractor obtain a permit at https://epermits2.logis.org/permits/permitrequirements.aspx?city=ed&permitid=94 and have them contact me to discuss scheduling.

    Drew