Fred Richards Park Playground

Construction will occur late 2019.

Construction will occur late 2019.

  • Playground Survey Update

    25 days ago
    Tiffany

    Survey one and two have been completed and the results have been incorporated into the design.

    Survey one and two have been completed and the results have been incorporated into the design.

  • What are we looking for?

    4 months ago

    The City will seek input on design concepts of the playground structure. The in scope elements include:

    • Style
    • Color
    • Play elements
    • Safety surface
    Decisions that have already been made include:
    • Playground location
    • Playground size
    • Budget
    • Vendor
    • Walking paths
    Engagement is set to wrap up by May 2019.

    The City will seek input on design concepts of the playground structure. The in scope elements include:

    • Style
    • Color
    • Play elements
    • Safety surface
    Decisions that have already been made include:
    • Playground location
    • Playground size
    • Budget
    • Vendor
    • Walking paths
    Engagement is set to wrap up by May 2019.