Fred Richards Park Playground

Playground is OPEN!

Playground is OPEN!

  • Playground Open

    26 days ago

    Playground is complete and will open at noon on 10/18!

    Playground is complete and will open at noon on 10/18!

  • Council Approved Playground Design

    4 months ago

    Council approved the purchase of the playground equipment at the July 16 meeting. Installation of the new playground will begin this fall.

    Council approved the purchase of the playground equipment at the July 16 meeting. Installation of the new playground will begin this fall.

  • Final Playground Design

    5 months ago

    Thank you to everyone who took the surveys and provided input at the open house. Special thanks to the students of Cornelia Elementary School for sharing their ideas.

    We complied it all. Here is what you chose:

    Engineered Wood Fiber Safety Surface

    Bright Colors- green and blue

    See Saw

    Swings

    Expression Swing

    Slides, Curved Zip Slide

    Climbers, Double Climber, Vertical Wall Climber, River Rock Climber

    Thank you to everyone who took the surveys and provided input at the open house. Special thanks to the students of Cornelia Elementary School for sharing their ideas.

    We complied it all. Here is what you chose:

    Engineered Wood Fiber Safety Surface

    Bright Colors- green and blue

    See Saw

    Swings

    Expression Swing

    Slides, Curved Zip Slide

    Climbers, Double Climber, Vertical Wall Climber, River Rock Climber

  • Playground Survey Update

    7 months ago
    Tiffany

    Survey one and two have been completed and the results have been incorporated into the design.

    Survey one and two have been completed and the results have been incorporated into the design.

  • What are we looking for?

    10 months ago

    The City will seek input on design concepts of the playground structure. The in scope elements include:

    • Style
    • Color
    • Play elements
    • Safety surface
    Decisions that have already been made include:
    • Playground location
    • Playground size
    • Budget
    • Vendor
    • Walking paths
    Engagement is set to wrap up by May 2019.

    The City will seek input on design concepts of the playground structure. The in scope elements include:

    • Style
    • Color
    • Play elements
    • Safety surface
    Decisions that have already been made include:
    • Playground location
    • Playground size
    • Budget
    • Vendor
    • Walking paths
    Engagement is set to wrap up by May 2019.