Morningside C Neighborhood Roadway Reconstruction

Share Morningside C Neighborhood Roadway Reconstruction on Facebook Share Morningside C Neighborhood Roadway Reconstruction on Twitter Share Morningside C Neighborhood Roadway Reconstruction on Linkedin Email Morningside C Neighborhood Roadway Reconstruction link

Morningside C Neighborhood Roadway Reconstruction updates will be hosted on this project page. Check back for updates!

This project is scheduled for construction in 2023. The work typically includes:

  • Complete reconstruction of the asphalt pavement,
  • Full replacement of concrete curb and gutter is anticipated,
  • Complete replacement of watermain and water services is anticipated,
  • Replacement of fire hydrants and watermain gate valves,
  • Improvements to the sanitary sewer and storm sewer systems, and
  • Construction of concrete sidewalks along Kipling Avenue (west side), Monterey Avenue (west side), Inglewood Avenue (south / east side), West 40th Street (south side) as well as Lynn Avenue (east side) and Grimes Avenue where gaps in the sidewalk network exist on the east side.
  • A preliminary assessment amount of $13,800 per Residential Equivalent Unit was approved by the Council at the December 2022 public hearing. This $13,800 per REU amount has been recorded with Hennepin County as pending assessments for all impacted properties. Favorable bids were received. If unforeseen changes do not occur during construction, an assessment cost savings of up to 30% could occur.

Morningside C Neighborhood Roadway Reconstruction updates will be hosted on this project page. Check back for updates!

This project is scheduled for construction in 2023. The work typically includes:

  • Complete reconstruction of the asphalt pavement,
  • Full replacement of concrete curb and gutter is anticipated,
  • Complete replacement of watermain and water services is anticipated,
  • Replacement of fire hydrants and watermain gate valves,
  • Improvements to the sanitary sewer and storm sewer systems, and
  • Construction of concrete sidewalks along Kipling Avenue (west side), Monterey Avenue (west side), Inglewood Avenue (south / east side), West 40th Street (south side) as well as Lynn Avenue (east side) and Grimes Avenue where gaps in the sidewalk network exist on the east side.
  • A preliminary assessment amount of $13,800 per Residential Equivalent Unit was approved by the Council at the December 2022 public hearing. This $13,800 per REU amount has been recorded with Hennepin County as pending assessments for all impacted properties. Favorable bids were received. If unforeseen changes do not occur during construction, an assessment cost savings of up to 30% could occur.

Ask a Question

Submit questions about the project here and city staff will get back to you!

If this is an emergency, please dial 911. If you have an after-hours, urgent, project related matter, please contact our after hours non-emergency line at 952-826-1600.

loader image
Didn't receive confirmation?
Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.
  • Share on kipling ave 4000 block, on newly constructed sidewalk some (most) houses have boulevard of grass (aka grass strip, road verge) between sidewalk and street, but the 3 houses on north end its just concrete sidewalk. why no boulevard/grass strip on north end? on Facebook Share on kipling ave 4000 block, on newly constructed sidewalk some (most) houses have boulevard of grass (aka grass strip, road verge) between sidewalk and street, but the 3 houses on north end its just concrete sidewalk. why no boulevard/grass strip on north end? on Twitter Share on kipling ave 4000 block, on newly constructed sidewalk some (most) houses have boulevard of grass (aka grass strip, road verge) between sidewalk and street, but the 3 houses on north end its just concrete sidewalk. why no boulevard/grass strip on north end? on Linkedin Email on kipling ave 4000 block, on newly constructed sidewalk some (most) houses have boulevard of grass (aka grass strip, road verge) between sidewalk and street, but the 3 houses on north end its just concrete sidewalk. why no boulevard/grass strip on north end? link

    on kipling ave 4000 block, on newly constructed sidewalk some (most) houses have boulevard of grass (aka grass strip, road verge) between sidewalk and street, but the 3 houses on north end its just concrete sidewalk. why no boulevard/grass strip on north end?

    PRA asked 3 months ago

    The grass boulevard was eliminated and the sidewalk shifted to the curb to protect the mature trees on the west side of Kipling Ave.  

    Thank you. 

  • Share When will the temporary No Parking signs be removed? On Lynn, there are permanent signs, metal temporary signs, and paper/wood police order signs. It is a mixture on both sides of the street. on Facebook Share When will the temporary No Parking signs be removed? On Lynn, there are permanent signs, metal temporary signs, and paper/wood police order signs. It is a mixture on both sides of the street. on Twitter Share When will the temporary No Parking signs be removed? On Lynn, there are permanent signs, metal temporary signs, and paper/wood police order signs. It is a mixture on both sides of the street. on Linkedin Email When will the temporary No Parking signs be removed? On Lynn, there are permanent signs, metal temporary signs, and paper/wood police order signs. It is a mixture on both sides of the street. link

    When will the temporary No Parking signs be removed? On Lynn, there are permanent signs, metal temporary signs, and paper/wood police order signs. It is a mixture on both sides of the street.

    Jeremy asked 5 months ago

    Thank you for letting us know. Signs should be removed now. Sorry for the delay.   

  • Share When will the gaps between asphalt driveways and cement aprons be filled in on Kipling? We are unable to leave or return to our garages since Tuesday October 10th. on Facebook Share When will the gaps between asphalt driveways and cement aprons be filled in on Kipling? We are unable to leave or return to our garages since Tuesday October 10th. on Twitter Share When will the gaps between asphalt driveways and cement aprons be filled in on Kipling? We are unable to leave or return to our garages since Tuesday October 10th. on Linkedin Email When will the gaps between asphalt driveways and cement aprons be filled in on Kipling? We are unable to leave or return to our garages since Tuesday October 10th. link

    When will the gaps between asphalt driveways and cement aprons be filled in on Kipling? We are unable to leave or return to our garages since Tuesday October 10th.

    RS asked 6 months ago

    Sorry for the delay.  The contractor is schedule to provide temporary access on Wed. 10/18 until the permanent asphalt driveways are done after the roadway is paved.  

    Thank you for your patience. 

  • Share This is a follow up question about asphalt driveway restoration. If the asphalt driveways cannot be blacktopped until the street is complete, then can the City at least fill in the gap with gravel ASAP so that cars can be put back into the garage? Please provide a date, if possible. Otherwise the driveway is inaccessible. My parents cannot go up the street to get their car since they are elderly and disabled. on Facebook Share This is a follow up question about asphalt driveway restoration. If the asphalt driveways cannot be blacktopped until the street is complete, then can the City at least fill in the gap with gravel ASAP so that cars can be put back into the garage? Please provide a date, if possible. Otherwise the driveway is inaccessible. My parents cannot go up the street to get their car since they are elderly and disabled. on Twitter Share This is a follow up question about asphalt driveway restoration. If the asphalt driveways cannot be blacktopped until the street is complete, then can the City at least fill in the gap with gravel ASAP so that cars can be put back into the garage? Please provide a date, if possible. Otherwise the driveway is inaccessible. My parents cannot go up the street to get their car since they are elderly and disabled. on Linkedin Email This is a follow up question about asphalt driveway restoration. If the asphalt driveways cannot be blacktopped until the street is complete, then can the City at least fill in the gap with gravel ASAP so that cars can be put back into the garage? Please provide a date, if possible. Otherwise the driveway is inaccessible. My parents cannot go up the street to get their car since they are elderly and disabled. link

    This is a follow up question about asphalt driveway restoration. If the asphalt driveways cannot be blacktopped until the street is complete, then can the City at least fill in the gap with gravel ASAP so that cars can be put back into the garage? Please provide a date, if possible. Otherwise the driveway is inaccessible. My parents cannot go up the street to get their car since they are elderly and disabled.

    Rebecca61 asked 8 months ago

    Asphalt driveways on Grimes / Inglewood Aves are being paved today, 8/24.  Thank you. 

  • Share When will the drives be filled in for 4006 and 4007 Grimes Ave S (approximately a 6 foot section between the sidewalk and the main drive)? They are asphalt drives so they have not been filled in yet. At this point, other addresses with concrete drives have been filled in. Thank you. on Facebook Share When will the drives be filled in for 4006 and 4007 Grimes Ave S (approximately a 6 foot section between the sidewalk and the main drive)? They are asphalt drives so they have not been filled in yet. At this point, other addresses with concrete drives have been filled in. Thank you. on Twitter Share When will the drives be filled in for 4006 and 4007 Grimes Ave S (approximately a 6 foot section between the sidewalk and the main drive)? They are asphalt drives so they have not been filled in yet. At this point, other addresses with concrete drives have been filled in. Thank you. on Linkedin Email When will the drives be filled in for 4006 and 4007 Grimes Ave S (approximately a 6 foot section between the sidewalk and the main drive)? They are asphalt drives so they have not been filled in yet. At this point, other addresses with concrete drives have been filled in. Thank you. link

    When will the drives be filled in for 4006 and 4007 Grimes Ave S (approximately a 6 foot section between the sidewalk and the main drive)? They are asphalt drives so they have not been filled in yet. At this point, other addresses with concrete drives have been filled in. Thank you.

    Rebecca61 asked 8 months ago

    Thanks for your question.  No specific date yet, but the asphalt driveways will be restored soon after the roadway paving is complete.  It's industry standard to pave asphalt driveways after the roadway paving.  Stay tuned for details on this page for updates. 

  • Share Will street light between 4005 and 4007 Grimes be replaced? on Facebook Share Will street light between 4005 and 4007 Grimes be replaced? on Twitter Share Will street light between 4005 and 4007 Grimes be replaced? on Linkedin Email Will street light between 4005 and 4007 Grimes be replaced? link

    Will street light between 4005 and 4007 Grimes be replaced?

    Rebecca61 asked 8 months ago

    Thank you for your question.  Yes, Xcel Energy will be reinstalling the street lighting in the project area. The timing of the reinstall will be up to Xcel Energy.    

  • Share Hi. I live on Kipling. I spoke to someone who shared work is expected to begin 8/14. Do you have an idea in mind for approximately how long the project will take. on Facebook Share Hi. I live on Kipling. I spoke to someone who shared work is expected to begin 8/14. Do you have an idea in mind for approximately how long the project will take. on Twitter Share Hi. I live on Kipling. I spoke to someone who shared work is expected to begin 8/14. Do you have an idea in mind for approximately how long the project will take. on Linkedin Email Hi. I live on Kipling. I spoke to someone who shared work is expected to begin 8/14. Do you have an idea in mind for approximately how long the project will take. link

    Hi. I live on Kipling. I spoke to someone who shared work is expected to begin 8/14. Do you have an idea in mind for approximately how long the project will take.

    WAG asked 9 months ago

    Thank you for your question.  The contractor estimates that the first layer of paving should be complete by mid-October.  The restoration would likely wrap up at the end of October. 

  • Share Hello, I live at 4002 Inglewood. What is the plan for the hill and wooded area across the street? Will there be replanting of trees, sidewalk and or retaining wall? Thanks! on Facebook Share Hello, I live at 4002 Inglewood. What is the plan for the hill and wooded area across the street? Will there be replanting of trees, sidewalk and or retaining wall? Thanks! on Twitter Share Hello, I live at 4002 Inglewood. What is the plan for the hill and wooded area across the street? Will there be replanting of trees, sidewalk and or retaining wall? Thanks! on Linkedin Email Hello, I live at 4002 Inglewood. What is the plan for the hill and wooded area across the street? Will there be replanting of trees, sidewalk and or retaining wall? Thanks! link

    Hello, I live at 4002 Inglewood. What is the plan for the hill and wooded area across the street? Will there be replanting of trees, sidewalk and or retaining wall? Thanks!

    Kamarten asked 9 months ago

    Thank you for your question.  There will be a 5' concrete sidewalk on the east side of Inglewood Avenue. We will replant trees in late summer / early fall to replace the cluster of trees that were removed near the hydrant.  The cottonwood trees on Avail Academy property will not be replaced.  A retaining wall is not proposed.  

  • Share Which side of Kipling Avenue will have the sidewalk construction? The west or the east? Thanks. on Facebook Share Which side of Kipling Avenue will have the sidewalk construction? The west or the east? Thanks. on Twitter Share Which side of Kipling Avenue will have the sidewalk construction? The west or the east? Thanks. on Linkedin Email Which side of Kipling Avenue will have the sidewalk construction? The west or the east? Thanks. link

    Which side of Kipling Avenue will have the sidewalk construction? The west or the east? Thanks.

    Slytoomey asked 12 months ago

    The Kipling Avenue sidewalk will be on the west side.  

    Thank you. 

  • Share Can you tell me how the division between Morningside D/E and C was determined? Thank you! on Facebook Share Can you tell me how the division between Morningside D/E and C was determined? Thank you! on Twitter Share Can you tell me how the division between Morningside D/E and C was determined? Thank you! on Linkedin Email Can you tell me how the division between Morningside D/E and C was determined? Thank you! link

    Can you tell me how the division between Morningside D/E and C was determined? Thank you!

    Lisa Hollensteiner asked about 1 year ago

    Thanks for your question.   A number of years ago, the entire City was divided into areas based on location, similar pavement ages and plat approval year.  They are then subdivided into smaller areas and capped at 2 miles of street length.   Based on this criteria, the Morningside neighborhood is broken into multiple project areas.  If border streets have the same criteria, the border streets go to the project area that better balances the amount of street length between the two project areas.  