Construction Update - 8/25/2023

Morningside Road, Grimes Avenue between Morningside Rd and W. 44th St, W 42nd St

  • Irrigation repairs to continue the week of 8/28. Please contact Nina if your irrigation needs restoration.
  • Topsoil installation will continue into the week of 8/28.
  • Seeding and hydro mulching is scheduled following the completion of the topsoil installation. Stay tuned for tips on growing green grass.
  • The final layer of asphalt is tentatively scheduled for mid-late September.


Turf Restoration in areas with weeds

  • The contractor plans to begin turf re-work the week of 8/28.
  • More than one restoration method may be utilized depending on the prevalence of weeds.


Project Wide

  • Retaining wall installations at select locations will continue after concrete items have been completed.
  • Concrete sidewalk and driveway apron work is tentatively scheduled for the week of 9/4.
  • Replacement of landscaping items impacted by construction are scheduled to continue the week of 8/28.
    1. If you had landscaping plantings, rock etc. impacted by construction, we need your help providing an itemized list of replacement landscaping items so the contractor can place the order with their supplier.
    2. Please reach out to Nina with details if you have not already done so.
  • Irrigation repairs to continue the week of 8/28. Please contact Nina if your irrigation system has not been restored. We apologize for the lengthy delays on the irrigation repairs.


Share Construction Update - 8/25/2023 on Facebook Share Construction Update - 8/25/2023 on Twitter Share Construction Update - 8/25/2023 on Linkedin Email Construction Update - 8/25/2023 link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>