Construction Update - 8/21/2026

Project Area

  • If you have any power outages or electrical appliance issues at your home, please call Xcel Energy at 1-800-895-1999.
  • Please see the construction phasing map
  • Please set out your garbage and recycling containers before 6 AM. We encouraged haulers to arrive early to avoid conflicts with the contractor and their operations
  • All work dates below are weather permitting


Phase 1 & 2:

  • General Notes
    • Vehicles cannot be parked on the street during construction working hours
    • Check your front door daily for notification of temporary water loss
    • Driveway Accessibility
      • You will generally have access in and out of your driveway each morning and evening, and potentially throughout the day. Exceptions include periodic excavations in front of your driveway that may last hours. The contractor will knock on your door notifying you of the excavation work and give you time to park your car on the street, so you aren’t blocked in.


Phase 1:

  • Upcoming Work (Week of 8/24)
    • Lee Valley Circle, Weston Circle and Village Drive sod installation is tentatively scheduled for the week of 8/24.
    • Lanham Lane
      • Asphalt driveway paving
      • Paver driveway reinstallation
      • Mailbox installation
    • Dublin Circle storm sewer installation
  • Ongoing Work
    • Lanham Lane, Kemrich Drive (east of Lanham Lane), Tara Road, Antrim Court and Antrim Terrace
      • Backfilling behind curb in preparation for topsoil installation.
      • Irrigation and landscape restoration


Phase 2:

  • Upcoming Work(Week of 8/24)
    • Fleetwood Drive and Tralee Drive
      • Backfilling behind curb in preparation for topsoil installation
      • Irrigation and landscape restoration
      • Asphalt driveway replacements
      • Mailbox installation
    • Antrim Road storm sewer installation
  • Ongoing Work
    • Kerry Road, Dublin Road and Wexford Road water service installation
    • 70th Street sanitary sewer main installation
  • Completed Work
    • Dublin Circle and Antrim Road water service installation
Share Construction Update - 8/21/2026 on Facebook Share Construction Update - 8/21/2026 on X (formerly Twitter) Share Construction Update - 8/21/2026 on Linkedin Email Construction Update - 8/21/2026 link