Construction Update - 9/11/2026
Project Area
- Crews will onsite Saturday, 9/12.
- If you have any power outages or electrical appliance issues at your home, please call Xcel Energy at 1-800-895-1999.
- See the statement provided by Xcel Energy.
- Please see the construction phasing map.
- A revision was made to include the entirety of Shannon Drive in Phase 3.
- Please set out your garbage and recycling containers before 6 AM. We encouraged haulers to arrive early to avoid conflicts with the contractor and their operations.
- All work dates below are weather permitting.
Phase 1 & 2:
- General Notes
- Vehicles cannot be parked on the street during construction working hours.
- Check your front door daily for notification of temporary water loss.
- Driveway Accessibility
- You will generally have access in and out of your driveway each morning and evening, and potentially throughout the day. Exceptions include periodic excavations in front of your driveway that may last hours. The contractor will knock on your door notifying you of the excavation work and give you time to park your car on the street, so you aren’t blocked in.
Phase 1:
- Upcoming Work (week of 9/14, unless otherwise noted)
- Village Drive sod installation
- Weston Circle and Lee Valley Circle tree replacements will happen later in the fall
- Ongoing Work
- Lanham Lane, Kemrich Drive (east of Lanham Lane), Tara Road, Antrim Court and Antrim Terrace
- Backfilling behind curb in preparation for topsoil installation
- Landscape restoration
- Sod installation
- Lanham Lane, Kemrich Drive (east of Lanham Lane), Tara Road, Antrim Court and Antrim Terrace
Phase 2:
- Upcoming Work (week of 9/14)
- Fleetwood Drive and Tralee Drive
- Backfilling behind curb in preparation for topsoil installation
- Irrigation and landscape restoration
- Dublin Circle, Dublin Road, Antrim Road, and 70th St
- Curb and gutter installation
- Concrete driveway installation
- Fleetwood Drive and Tralee Drive
- Ongoing Work
- Fleetwood Drive and Tralee Drive
- Backfilling behind curb in preparation for topsoil installation
- Irrigation and landscape restoration
- Completed Work
- Dublin Circle
- Sump line installation continues
Share Construction Update - 9/11/2026 on Facebook
Share Construction Update - 9/11/2026 on X (formerly Twitter)
Share Construction Update - 9/11/2026 on Linkedin
Email Construction Update - 9/11/2026 link
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends