The City is considering replacing the existing bridge because the existing limestone (relatively weak building material) masonry railings and corrugated-metal arch are deteriorating. In addition, the height and strength of the railings does not meet current standards and the narrow deck is inadequate to safely accommodate pedestrians and bicyclists.

Construction of a replacement bridge is unknown at this time. Staff is completing the Section 106 review process and must consult with the State Historic Preservation Office (SHPO) and other interested parties, such as relevant state agencies, local heritage preservation commissions, and interested individuals, as it goes through the process.

  1. Multi-plate Corrugated Metal Arch
  2. Limestone Masonry Railing and Headwall
  3. Concrete Footing — Cracked in multiple locations, scour occurring under north footing.
  4. Metal Arch — Corroded at concrete footing. Arch could be strengthened but corrosion would continue and bridge’s load-carrying capacity would be limited, as it is now.
  5. Fill — Fill above metal arch must be removed to repair corroding arch and cracked concrete footings. Stone railings/headwalls would be difficult to brace during process.
  6. Limestone Railing & Headwall — Railing doesn’t meet crash standards. Stone is severely deteriorated.
  7. Roadway — Roadway needs to be 10’ wider for pedestrian and bike use. West headwall would have to be taken down stone by stone and rebuilt 10’ to the west. Stone would crumble in process.

The City is considering replacing the existing bridge because the existing limestone (relatively weak building material) masonry railings and corrugated-metal arch are deteriorating. In addition, the height and strength of the railings does not meet current standards and the narrow deck is inadequate to safely accommodate pedestrians and bicyclists.

Construction of a replacement bridge is unknown at this time. Staff is completing the Section 106 review process and must consult with the State Historic Preservation Office (SHPO) and other interested parties, such as relevant state agencies, local heritage preservation commissions, and interested individuals, as it goes through the process.

  1. Multi-plate Corrugated Metal Arch
  2. Limestone Masonry Railing and Headwall
  3. Concrete Footing — Cracked in multiple locations, scour occurring under north footing.
  4. Metal Arch — Corroded at concrete footing. Arch could be strengthened but corrosion would continue and bridge’s load-carrying capacity would be limited, as it is now.
  5. Fill — Fill above metal arch must be removed to repair corroding arch and cracked concrete footings. Stone railings/headwalls would be difficult to brace during process.
  6. Limestone Railing & Headwall — Railing doesn’t meet crash standards. Stone is severely deteriorated.
  7. Roadway — Roadway needs to be 10’ wider for pedestrian and bike use. West headwall would have to be taken down stone by stone and rebuilt 10’ to the west. Stone would crumble in process.

Ask a Question

Submit questions about the project here and city staff will get back to you!

If this is an emergency, please dial 911. If you have an after-hours, urgent, project related matter, please contact our after hours non-emergency line at 952-826-1600.

loader image
Didn't receive confirmation?
Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.
Page last updated: 07 Feb 2024, 09:40 AM