Design Update 2

Today I will be out on site knocking on doors to build awareness and gather input for homeowners with specific construction impacts. Here are key issues we are still tracking;

  • Expect vehicle closure of the bridge for a maximum of two weeks, with temporary pedestrian access available. We will provide schedule information once a contractor is selected in summer.
  • We are offering a hotel option for residents with a medical need
  • We have a design for water and sewer crossings, we will coordinate several short water outages with affected residents during the project.
Share Design Update 2 on Facebook Share Design Update 2 on Twitter Share Design Update 2 on Linkedin Email Design Update 2 link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>