Fire Station 2

Share Fire Station 2 on Facebook Share Fire Station 2 on Twitter Share Fire Station 2 on Linkedin Email Fire Station 2 link

Project Background
After years of research, it was determined the community needs a larger Fire Station 2. The current Fire Station 2 is not large enough to provide the level of services needed in the southeast quadrant in the future, and the land it’s on is too small to build the size of station needed.

The site located at 4401 W. 76th St. was chosen for the new Fire Station 2 and purchased in 2022. The project partners were named:

  • Tegra Group - Owners Representative
  • BKV - Project Architect and Engineer
  • Kraus-Anderson - Construction Manager

More project background information can be found under the Documents section.

Project Background
After years of research, it was determined the community needs a larger Fire Station 2. The current Fire Station 2 is not large enough to provide the level of services needed in the southeast quadrant in the future, and the land it’s on is too small to build the size of station needed.

The site located at 4401 W. 76th St. was chosen for the new Fire Station 2 and purchased in 2022. The project partners were named:

  • Tegra Group - Owners Representative
  • BKV - Project Architect and Engineer
  • Kraus-Anderson - Construction Manager

More project background information can be found under the Documents section.

  • Project Phase 1

    Share Project Phase 1 on Facebook Share Project Phase 1 on Twitter Share Project Phase 1 on Linkedin Email Project Phase 1 link

    The Fire Station 2 project is currently in Phase 1: Site Selection.

    At this time, two sites in the southeast quadrant of the City have been identified for potential development of a new Fire Station 2. One is located within the boundaries of Rosland Park, on the north end of the East parking lot. A parking ramp would be constructed and located on the south side of the East Parking lot. The other site is located at 4401 76th St. W., in the Pentagon Park neighborhood.

    In order to provide a forum for neighborhood concerns and see how City staff can address them moving forward, a neighborhood meeting has been scheduled for late March.

    Several questions have been raised about the station's design specifics and costs, along with other operational issues. It is important to note that, at this stage, the details are limited and will be addressed once the site is selected. The graphic below illustrates the project timeline.

    Stay tuned to this site for further updates as the process moves forward.

  • FAQ and More Information Coming

    Share FAQ and More Information Coming on Facebook Share FAQ and More Information Coming on Twitter Share FAQ and More Information Coming on Linkedin Email FAQ and More Information Coming link

    Thank you to everyone who sent in questions so far! The City is preparing responses in a FAQ format and will notify those who submitted when it is posted. Parking, park amenities, sound, traffic, aquatic center, etc. will be addressed. Stay up to date by checking into this project page.

Page last updated: 18 Sep 2025, 08:57 AM