Parklawn Court Neighborhood Roadway Reconstruction

Share Parklawn Court Neighborhood Roadway Reconstruction on Facebook Share Parklawn Court Neighborhood Roadway Reconstruction on Twitter Share Parklawn Court Neighborhood Roadway Reconstruction on Linkedin Email Parklawn Court Neighborhood Roadway Reconstruction link

Parklawn Court Roadway Reconstruction updates will be hosted on this project page. Sign up for email updates!

The proposed 2026 reconstruction project includes:

  • Complete reconstruction of the concrete pavement with asphalt pavement,
  • Replacement of concrete curb and gutter,
  • Replacement of a portion of the watermain and water services,
  • Improvements to the sanitary sewer and storm sewer systems, and
  • Potential construction of concrete sidewalk facilities
  • The project is funded by a combination of special assessments, property taxes, respective utility funds and the Pedestrian and Cyclist Safety (PACS) fund.
  • An estimated preliminary assessment range will be prepared later during the summer. Based on the assessment policy, 52.6% of the roadway project costs will be assessed to Prospect Knolls A/C/D property owners, and 47.4% of the roadway project costs will be paid for by property taxes.

Parklawn Court Roadway Reconstruction updates will be hosted on this project page. Sign up for email updates!

The proposed 2026 reconstruction project includes:

  • Complete reconstruction of the concrete pavement with asphalt pavement,
  • Replacement of concrete curb and gutter,
  • Replacement of a portion of the watermain and water services,
  • Improvements to the sanitary sewer and storm sewer systems, and
  • Potential construction of concrete sidewalk facilities
  • The project is funded by a combination of special assessments, property taxes, respective utility funds and the Pedestrian and Cyclist Safety (PACS) fund.
  • An estimated preliminary assessment range will be prepared later during the summer. Based on the assessment policy, 52.6% of the roadway project costs will be assessed to Prospect Knolls A/C/D property owners, and 47.4% of the roadway project costs will be paid for by property taxes.
  • Please take a few minutes to complete the Resident Parklawn Ct Roadway Reconstruction Survey.

     

    Your input is important to us! Complete the survey online at https://bit.ly/ParklawnCourt. The survey will close on August 29. Please call 952-826-0371 if you would like a copy mailed to you. 

     

    The survey will assist the City’s design of Parklawn Ct that can safely accommodate all users. Please help us identify and evaluate areas where we can make improvements to your neighborhood. 

     

    As part of the planning process, the City is evaluating potential changes to the street layout, including the possible installation of sidewalks on one or both sides of the street. The Engineering staff is requesting input from residents related to sidewalks and parking.

     

    Item

    Street

    Pedestrian Facility

    Included in the Pedestrian and Bicycle Master Plan?

    1

    Parklawn Ct

    5’ wide concrete sidewalk on the north side

    No, considering adding

    2

    Parklawn Ct

    5’ wide concrete sidewalk on the south side

    No, considering adding

    3

    Parklawn Ct

    5’ wide concrete sidewalks on both sides

    No, considering adding

    4

    Parklawn Ct

    No sidewalks on the either side

    N/A

     

     


    Take Survey
    Share Neighborhood Reconstruction Survey on Facebook Share Neighborhood Reconstruction Survey on Twitter Share Neighborhood Reconstruction Survey on Linkedin Email Neighborhood Reconstruction Survey link
Page published: 25 Jun 2025, 12:24 PM