Blake Road - 2022 / 2023 Roadway Reconstruction
Share Blake Road - 2022 / 2023 Roadway Reconstruction on Facebook
Share Blake Road - 2022 / 2023 Roadway Reconstruction on Twitter
Share Blake Road - 2022 / 2023 Roadway Reconstruction on Linkedin
Email Blake Road - 2022 / 2023 Roadway Reconstruction link
Blake Road Roadway Reconstruction updates will be hosted on this project page. Check back for updates!
The 2022 and 2023 project construction includes:
- Complete reconstruction of the pavement,
- Full installation or replacement of concrete curb and gutter,
- Partial replacement of watermain and water services,
- Improvements to the sanitary sewer and storm sewer systems,
- Construction of mini roundabout at the Interlachen Boulevard intersection,
- Construction of two 5-foot on-street concrete bike lanes,
- Construction of a 6-foot concrete sidewalk along the west side of the street south of Interlachen Boulevard, and
- Construction of a 8-foot concrete shared use path along the west side of the street north of Interlachen Boulevard.
- Assessments to property owners for the roadway project costs, estimated at $7,000 per residential equivalent unit.