Brook Drive Culvert Crossing

Share Brook Drive Culvert Crossing on Facebook Share Brook Drive Culvert Crossing on Twitter Share Brook Drive Culvert Crossing on Linkedin Email Brook Drive Culvert Crossing link

This project will replace the Brook Drive culverts at Nine Mile creek. The existing culverts and stormwater infrastructure has reached the end of its useful life. The project includes improvements to public utilities and stabilization of the creek bank.

Key Information:

  • Planned construction is October/November 2024
  • The project is funded by the stormwater utility fund, there is no special assessed cost to nearby residents.
  • The scope of the replacement includes;
    • Replacement of two culverts with a new box culvert
    • Repair of nearby large diameter concrete storm pipe
    • New sections of road, curb and catch basins
    • Temporary water and watermain replacement
    • Sanitary sewer lining

This project will replace the Brook Drive culverts at Nine Mile creek. The existing culverts and stormwater infrastructure has reached the end of its useful life. The project includes improvements to public utilities and stabilization of the creek bank.

Key Information:

  • Planned construction is October/November 2024
  • The project is funded by the stormwater utility fund, there is no special assessed cost to nearby residents.
  • The scope of the replacement includes;
    • Replacement of two culverts with a new box culvert
    • Repair of nearby large diameter concrete storm pipe
    • New sections of road, curb and catch basins
    • Temporary water and watermain replacement
    • Sanitary sewer lining
  • 11/15 Update

    Share 11/15 Update on Facebook Share 11/15 Update on Twitter Share 11/15 Update on Linkedin Email 11/15 Update link

    Today, construction will begin to focus on preparation for paving the road. Depending on weather conditions, we anticipate the road to be paved by mid to late week next week. The storm sewer on the west side of the culvert will also be undergoing maintenance and repairs as construction this fall wraps up. A temporary bituminous curb will be installed to last through the winter, and the contractors will come back in the spring to install a permanent concrete curb. Thank you for your patience as this stage of construction is finalized.

  • 11/13 Evening Update

    Share 11/13 Evening Update on Facebook Share 11/13 Evening Update on Twitter Share 11/13 Evening Update on Linkedin Email 11/13 Evening Update link

    We got an update from the contractor, they're planning to have the road open by 7 pm tonight. Some of the work took longer than expected. We apologize for any inconvenience and thank you for your continued patience.

    -Ross and Owen

  • 11/13 Morning Update

    Share 11/13 Morning Update on Facebook Share 11/13 Morning Update on Twitter Share 11/13 Morning Update on Linkedin Email 11/13 Morning Update link

    The road across the culvert will be closed today from approximately 8:00 am to 5:00 pm to install a manhole structure. Owen Richey or the contractor have gone door-to-door to notify residents with apologies for the short notice.

    The contractor will be taking garbage bins up the road for service.

    Please consider parking your vehicle on Brook Drive between McGuire Road and Hillside Lane if you anticipate needing to drive during the day. Thank you for your patience.

  • Construction Delay Centerpoint Energy Gas Line

    Share Construction Delay Centerpoint Energy Gas Line on Facebook Share Construction Delay Centerpoint Energy Gas Line on Twitter Share Construction Delay Centerpoint Energy Gas Line on Linkedin Email Construction Delay Centerpoint Energy Gas Line link

    This week, construction is focused on bank stabilization and cleanup of the project site.

    We are still waiting on a gas line to be moved, and the rest of the construction work can not begin until this is done.

    If the gas line is relocated, then there will likely be at least two days later this week with daily closures of the road during construction, starting at 8:00 am and ending in the evening. Please consider parking your vehicle on Brook Drive between McGuire Road and Hillside Lane on these days. We will update you again as soon as we have a set schedule for when these daily closures will take place or if anything changes. Thank you for your patience.

  • Construction Update - November 4

    Share Construction Update - November 4 on Facebook Share Construction Update - November 4 on Twitter Share Construction Update - November 4 on Linkedin Email Construction Update - November 4 link

    Construction will not be occurring this week. Currently, the plan is to begin construction again on Monday, November 11th, after CenterPoint Energy has relocated a gas line. During the week of the 11th, there will likely be at least two days with daily closures of the road during construction, starting at 8:00 am. Please consider parking your vehicle on Brook Drive between McGuire Road and Hillside Lane on these days. We will update you again as soon as we have a set schedule for when these daily closures will take place or if anything changes. Thank you for your patience.

  • Construction Update - October 31

    Share Construction Update - October 31 on Facebook Share Construction Update - October 31 on Twitter Share Construction Update - October 31 on Linkedin Email Construction Update - October 31 link

    Construction will not be occurring today due to rain. The road will remain open all day. Tomorrow, November 1st, the road will be closed for one hour at approximately 8:00 am. Please have your vehicle out before then if you anticipate needing to drive in the morning. Thank you!

  • Construction Update - October 28

    Share Construction Update - October 28 on Facebook Share Construction Update - October 28 on Twitter Share Construction Update - October 28 on Linkedin Email Construction Update - October 28 link

    This week, construction will be focused on removing and replacing the storm sewer to the west of the new culvert. On Tuesday, October 29th, there will be a daytime closure of the roadway so construction can occur. The road will be open before and after construction, but you will not have driving access during the workday. Please consider parking your vehicle on Brook Drive between McGuire Rd and Hillside Ln if you anticipate needing to drive during construction. You will be able to bring your car back to your house at the end of the day. There will likely be two more daytime road closures as construction is wrapped up, and those dates will be communicated to you once they are confirmed. Thank you for your patience.

  • 1 Lane Road

    Share 1 Lane Road on Facebook Share 1 Lane Road on Twitter Share 1 Lane Road on Linkedin Email 1 Lane Road link

    Starting at 6:30 pm October 25th, a single lane roadway will be open across the culvert. Residents can drive their vehicles back to their homes at this time. During construction next week, there will be temporary closures during the day, but the road will be open in the mornings and after work is done in the evenings. Thank you for your patience with this.

    We'll provide a schedule Monday afternoon for the daily closures.

  • Construction Update - October 24

    Share Construction Update - October 24 on Facebook Share Construction Update - October 24 on Twitter Share Construction Update - October 24 on Linkedin Email Construction Update - October 24 link

    We have been tracking the weather and it is looking like Edina will receive 0.1" to 0.25" of rain this evening. We wanted to send out an update to let residents know to be alert when crossing the pedestrian bridge during and after the rain. The contractors will be widening a channel for water to flow under the bridge safely in case the streamflow increases. If you see water flowing over the bridge, do not attempt to cross, and please contact Owen Richey at 360-296-8278 and Ross Larson at 612-364-0601. Thank you.

  • Water Shut Down - Friday, October 25th

    Share Water Shut Down - Friday, October 25th on Facebook Share Water Shut Down - Friday, October 25th on Twitter Share Water Shut Down - Friday, October 25th on Linkedin Email Water Shut Down - Friday, October 25th link

    At approximately 8:00 am on Friday, October 25th, the watermain will be shut down for the day for construction. Only the houses east of the culvert will be impacted. Water service will be interrupted, and we will send an update when service is back up and running.

Page last updated: 16 May 2025, 08:34 AM