Morningside Flood Infrastructure Project

Share on Facebook Share on Twitter Share on Linkedin Email this link

The Morningside Neighborhood has several low and landlocked areas prone to flooding. Climate change has already increased the risk of flooding and will continue to do so. This project helps the community be more resilient to flooding. Project benefits are balanced across the neighborhood and there is no increase in risk to any property.

Ponds, pipes and a surface swale will be used to safely move and store floodwaters. An expanded pipe and swale will provide overflow from the Lynn/Kipling inundation area and the Grimes Avenue low point, and an expanded and reconfigured pipe network and minor grade changes will move water away from homes. Weber Pond and the Lynn/Kipling Pond will be expanded and lowered. About six acres of trees will be removed in Weber Woods to accommodate the larger ponds.

The flood infrastructure project also includes:

  • Natural resources restoration in upland areas.
  • Nature trails and bridge crossings at two locations at Weber Park.
  • Improved pedestrian access to the park with some ADA-compliant paths in Weber Park.
  • Rebuilt sports fields in impacted areas with new turf and irrigation systems.

The flood infrastructure project coincides with planned roadway reconstruction in the neighborhood in 2022 and 2023.

The Morningside Neighborhood has several low and landlocked areas prone to flooding. Climate change has already increased the risk of flooding and will continue to do so. This project helps the community be more resilient to flooding. Project benefits are balanced across the neighborhood and there is no increase in risk to any property.

Ponds, pipes and a surface swale will be used to safely move and store floodwaters. An expanded pipe and swale will provide overflow from the Lynn/Kipling inundation area and the Grimes Avenue low point, and an expanded and reconfigured pipe network and minor grade changes will move water away from homes. Weber Pond and the Lynn/Kipling Pond will be expanded and lowered. About six acres of trees will be removed in Weber Woods to accommodate the larger ponds.

The flood infrastructure project also includes:

  • Natural resources restoration in upland areas.
  • Nature trails and bridge crossings at two locations at Weber Park.
  • Improved pedestrian access to the park with some ADA-compliant paths in Weber Park.
  • Rebuilt sports fields in impacted areas with new turf and irrigation systems.

The flood infrastructure project coincides with planned roadway reconstruction in the neighborhood in 2022 and 2023.

Share on Facebook Share on Twitter Share on Linkedin Email this link

Morningside Neighborhood

almost 4 years

Visit the map and drop a pin to let us know about your favorite places in the neighborhood, how you recreate in the neighborhood, your experiences with flooding and drainage issues, and areas that concern you related to flooding and drainage.

Orange lines represent roads planned for reconstruction in 2022 blue lines represent roads planned for reconstruction in 2023.

Check out the What is My Flood Risk? interactive map to view risk for a specific property.