Morningside Flood Infrastructure Project

Share Morningside Flood Infrastructure Project on Facebook Share Morningside Flood Infrastructure Project on Twitter Share Morningside Flood Infrastructure Project on Linkedin Email Morningside Flood Infrastructure Project link

The Morningside Neighborhood has several low and landlocked areas prone to flooding. Climate change has already increased the risk of flooding and will continue to do so. This project helps the community be more resilient to flooding. Project benefits are balanced across the neighborhood and there is no increase in risk to any property.

Ponds, pipes and a surface swale will be used to safely move and store floodwaters. An expanded pipe and swale will provide overflow from the Lynn/Kipling inundation area and the Grimes Avenue low point, and an expanded and reconfigured pipe network and minor grade changes will move water away from homes. Weber Pond and the Lynn/Kipling Pond will be expanded and lowered. About six acres of trees will be removed in Weber Woods to accommodate the larger ponds.

The flood infrastructure project also includes:

  • Natural resources restoration in upland areas.
  • Nature trails and bridge crossings at two locations at Weber Park.
  • Improved pedestrian access to the park with some ADA-compliant paths in Weber Park.
  • Rebuilt sports fields in impacted areas with new turf and irrigation systems.

The flood infrastructure project coincides with planned roadway reconstruction in the neighborhood in 2022 and 2023.

The Morningside Neighborhood has several low and landlocked areas prone to flooding. Climate change has already increased the risk of flooding and will continue to do so. This project helps the community be more resilient to flooding. Project benefits are balanced across the neighborhood and there is no increase in risk to any property.

Ponds, pipes and a surface swale will be used to safely move and store floodwaters. An expanded pipe and swale will provide overflow from the Lynn/Kipling inundation area and the Grimes Avenue low point, and an expanded and reconfigured pipe network and minor grade changes will move water away from homes. Weber Pond and the Lynn/Kipling Pond will be expanded and lowered. About six acres of trees will be removed in Weber Woods to accommodate the larger ponds.

The flood infrastructure project also includes:

  • Natural resources restoration in upland areas.
  • Nature trails and bridge crossings at two locations at Weber Park.
  • Improved pedestrian access to the park with some ADA-compliant paths in Weber Park.
  • Rebuilt sports fields in impacted areas with new turf and irrigation systems.

The flood infrastructure project coincides with planned roadway reconstruction in the neighborhood in 2022 and 2023.

  • Weber Park Field Activity open through July 6th

    Share Weber Park Field Activity open through July 6th on Facebook Share Weber Park Field Activity open through July 6th on Twitter Share Weber Park Field Activity open through July 6th on Linkedin Email Weber Park Field Activity open through July 6th link
    supporting image

    There’s still time to experience the self-guided interactive tour of flood impacts in the Morningside Flood neighborhood! Visit Weber Park through this weekend to discover the 7 stations throughout the park and learn how this area is impacted by rain. To learn more or participate virtually, view the interactive activity map.

  • Weber Park Walkabout Activity - now open

    Share Weber Park Walkabout Activity - now open on Facebook Share Weber Park Walkabout Activity - now open on Twitter Share Weber Park Walkabout Activity - now open on Linkedin Email Weber Park Walkabout Activity - now open link
    supporting image

    Visit Weber Park for a self-guided exploration of flooding impacts in the Morningside neighborhood. The first stop is the corner of Grimes Avenue and 42nd St W. You are invited to share your photos, tell your story, and create a flower to add to the community raingarden. You can also participate virtually here.

  • Updates

    Share Updates on Facebook Share Updates on Twitter Share Updates on Linkedin Email Updates link

    We'll post project updates here!

Page last updated: 19 Apr 2024, 11:05 AM