Vernon Avenue & Highway 100 Interchange Project

Share Vernon Avenue & Highway 100 Interchange Project on Facebook Share Vernon Avenue & Highway 100 Interchange Project on Twitter Share Vernon Avenue & Highway 100 Interchange Project on Linkedin Email Vernon Avenue & Highway 100 Interchange Project link

The City of Edina partnering with Hennepin County in coordination with Minnesota Department of Transportation, is replacing the bridge over Highway 100 and the Vernon Avenue Bridge (County Road 158) over the Canadian Pacific (CP) Railroad. The overall project will also improve the intersections at Interlachen Boulevard, Gus Young Lane, Arcadia Avenue and the Highway 100 on- and off-ramps.


The size of the existing sidewalk and the lack of separation from heavy traffic make this street uncomfortable for many pedestrians, creating a significant barrier within the Grandview District. Additionally, the interchange with TH 100 is a complicated and redundant system of six unique access ramps that connect to four different streets within the district.

This project would improve safety and mobility for all users and eliminate redundant access ramps. Construction is anticipated to begin April 21.

Project goals

o Improve safety and mobility for all users

o Create new separated pedestrian routes

o Improve traffic operations

o Consolidate TH 100 access points

o Improve connectivity between residential and commercial areas of the district

o Replace Vernon Ave bridge meeting CP Rail clearance requirements

o Limit construction impacts to the public and create greater funding efficiency by combining city

and county projects

o Enhance economic viability with improved access


Changes to be made

Arcadia Avenue

  • Addition of 10-foot-wide sidewalk and ADA-compliant pedestrian ramps
  • New streetlights

Minnesota Highway 100

  • Removal of redundant on- and off ramps and the creation of a tight diamond interchange
  • New noise wall along northbound on-ramp

Interlachen Boulevard and Gus Young Lane

  • Addition of 10-foot-wide sidewalks and ADA-compliant pedestrian ramps
  • New left turn lanes
  • New traffic signal with ADA-compliant audible crossings
  • New ADA-compliant entrance into Edina Liquor

Vernon Avenue and W. 50th St.

Two new bridges:

  1. New Vernon Avenue Bridge that is widened and raised to meet railroad height requirements
  2. New Highway 100 Bridge that creates space for the below improvements:
    • 10-foot-wide sidewalks and ADA-compliant pedestrian ramps
    • Pedestrian refuge islands
    • New dual left-turn lanes in both east and west directions
    • New traffic signals with ADA-compliant audible crossings

The City of Edina partnering with Hennepin County in coordination with Minnesota Department of Transportation, is replacing the bridge over Highway 100 and the Vernon Avenue Bridge (County Road 158) over the Canadian Pacific (CP) Railroad. The overall project will also improve the intersections at Interlachen Boulevard, Gus Young Lane, Arcadia Avenue and the Highway 100 on- and off-ramps.


The size of the existing sidewalk and the lack of separation from heavy traffic make this street uncomfortable for many pedestrians, creating a significant barrier within the Grandview District. Additionally, the interchange with TH 100 is a complicated and redundant system of six unique access ramps that connect to four different streets within the district.

This project would improve safety and mobility for all users and eliminate redundant access ramps. Construction is anticipated to begin April 21.

Project goals

o Improve safety and mobility for all users

o Create new separated pedestrian routes

o Improve traffic operations

o Consolidate TH 100 access points

o Improve connectivity between residential and commercial areas of the district

o Replace Vernon Ave bridge meeting CP Rail clearance requirements

o Limit construction impacts to the public and create greater funding efficiency by combining city

and county projects

o Enhance economic viability with improved access


Changes to be made

Arcadia Avenue

  • Addition of 10-foot-wide sidewalk and ADA-compliant pedestrian ramps
  • New streetlights

Minnesota Highway 100

  • Removal of redundant on- and off ramps and the creation of a tight diamond interchange
  • New noise wall along northbound on-ramp

Interlachen Boulevard and Gus Young Lane

  • Addition of 10-foot-wide sidewalks and ADA-compliant pedestrian ramps
  • New left turn lanes
  • New traffic signal with ADA-compliant audible crossings
  • New ADA-compliant entrance into Edina Liquor

Vernon Avenue and W. 50th St.

Two new bridges:

  1. New Vernon Avenue Bridge that is widened and raised to meet railroad height requirements
  2. New Highway 100 Bridge that creates space for the below improvements:
    • 10-foot-wide sidewalks and ADA-compliant pedestrian ramps
    • Pedestrian refuge islands
    • New dual left-turn lanes in both east and west directions
    • New traffic signals with ADA-compliant audible crossings
  • April 29, 2025 Update

    Share April 29, 2025 Update on Facebook Share April 29, 2025 Update on Twitter Share April 29, 2025 Update on Linkedin Email April 29, 2025 Update link

    Thank you for your patience during the first week of the road closure. Remember businesses are open and accessible. All vehicles should be following the detour and taking a right from eastbound Interlachen to Vernon Avenue unless you’re visiting the local businesses. The removal of the noise wall along Vernon Ave is scheduled to start tomorrow, Weds, April 30. The Vernon Ave Bridge is tentatively scheduled for removal May 8 – May 12 and the Highway 100 Bridge is tentatively scheduled for removal May 16 – May 19. The Vernon Ave Bridge removal will occur during normal working hours. The Highway 100 Bridge removal will occur over a weekend closure of Highway 100. Work will most likely occur 24-hrs during that weekend closure. In preparation of the weekend closure of Highway 100, there will be some lane closures between 10am – 2pm to prep the center median for the work. The next Highway Talk is May 1 at 11 am. Edinamn.gov/Highway100Talks to participate. Thanks.

  • April 24, 2025 Update

    Share April 24, 2025 Update on Facebook Share April 24, 2025 Update on Twitter Share April 24, 2025 Update on Linkedin Email April 24, 2025 Update link

    Grandview Businesses and the 50th & France District are open for business during construction. Vernon Avenue was closed on April 23. The first week or so is always the most chaotic as travelers find different ways to get to their places. Please be patience. Staff is monitoring traffic. Adjustments have already been made to assist movements. Adjustments are being made to the Interlachen traffic signal. Regulatory detour signs are up. In addition to all the material on the website for businesses to help keep employees and customers informed, the City is fabricating custom directional signs. These signs will help direct traffic to the Grandview Businesses and the 50th & France District. Those signs will be installed late this week or early next week. Construction will slowly ramp up over the course of the first few weeks. Equipment will be delivered, and concrete jackhammering will begin late next week. The contractor will be using the city's parcel at 5146 Eden Avenue for equipment, materials, and employee parking. Our next Highway Talk is May 1 at 11 am. If you're signing up for the text messages for unexpected changes or disruptions, be sure to enter the text without any spaces. Text HIGHWAY100-RESIDENT to 844-929-4328 and Text HIGHWAY100-BUSINESS to 844-929-4328. Thanks. Chad Millner, City Engineer.

  • April 18, 2025

    Share April 18, 2025 on Facebook Share April 18, 2025 on Twitter Share April 18, 2025 on Linkedin Email April 18, 2025 link

    Road Closure beginning April 23: Vernon Avenue and 50th Street between Interlachen Blvd and Grange Road with the exception of the on- and off-ramps to Highway 100 will close on April 23. The Grandview Businesses and the 50th & France Business District are open and accessible during the project. Signs for the detours will be placed Monday and Tuesday, April 21 & 22. Eden Avenue will be the main east-west street. Construction will slowly ramp up over the course of the first few weeks. Equipment will be delivered and concrete jackhammering will begin late next week. The contractor will be using the city's parcel at 5146 Eden Avenue for equipment, materials, and employee parking. A recording of the Online Project Talk from April 17 can be found here. Thanks, Chad Millner, City Engineer.

  • April 15, 2025 Update

    Share April 15, 2025 Update on Facebook Share April 15, 2025 Update on Twitter Share April 15, 2025 Update on Linkedin Email April 15, 2025 Update link
    supporting image

    Road Closure beginning April 23: Vernon Avenue and 50th Street between Interlachen Blvd and Grange Road with the exception of the on- and off-ramps to Highway 100 will close on April 23. The Grandview Businesses and the 50th & France Business District are open and accessible during the project. The local detours are shown here. Remember to log in April 17 at 11 am here to learn more about the project. Thanks, Chad Millner, City Engineer.

  • April 3, 2025 Update

    Share April 3, 2025 Update on Facebook Share April 3, 2025 Update on Twitter Share April 3, 2025 Update on Linkedin Email April 3, 2025 Update link

    The Vernon Avenue and Highway 100 Interchange Project is scheduled to start April 21. The contractor is targeting April 23 to close Vernon Avenue and 50th Street between Interlachen Blvd and Grange Road with the exception of the on and off-ramps to Highway 100. Remember to log in April 17 at 11 am to learn more about the project at EdinaMN.gov/Highway100Talks or EdinaMN.gov/highway100talks. This is a re-occurring meeting Thursday mornings every other week during the project. A recap of the April 3 meeting can be found here.

    Recap: Vernon / 50th Interchange Project Bi-Weekly Public Meeting Thursday, April 3.

    Thanks, Chad Millner, City Engineer.

    PowerPoint Slides can be found in the document area linked here.

    https://www.bettertogetheredina.org/20963/widgets/69150/documents/66396

  • April 2, 2025 Update

    Share April 2, 2025 Update on Facebook Share April 2, 2025 Update on Twitter Share April 2, 2025 Update on Linkedin Email April 2, 2025 Update link

    Tree removals for the project have been completed. Staff provided a project update at the April 1 City Council Works Session. We discussed schedule, management of traffic, communications, and funding. We will be asking council to award a contract to Ames Construction on April 16. The exact schedule is still being developed but will be available soon. Remember to log in tomorrow at 11 am to learn more about the project at EdinaMN.gov/Highway100Talks or EdinaMN.gov/highway100talks. This is the first of many Thursday morning meetings available every other week during the project. Thanks, Chad Millner, City Engineer.

  • March 26, 2025 Invite to Virtual Meeting

    Share March 26, 2025 Invite to Virtual Meeting on Facebook Share March 26, 2025 Invite to Virtual Meeting on Twitter Share March 26, 2025 Invite to Virtual Meeting on Linkedin Email March 26, 2025 Invite to Virtual Meeting link

    Come learn about the upcoming Vernon Avenue & Highway 100 Interchange Project. City Engineer Chad Millner will host a virtual public meeting. All are welcome to join this 30-minute meeting. The first meeting will occur on April 3 at 11 am. This meeting will re-occur every 2-weeks until the project is completed on Thursdays at 11 am. To participate, type either of the following addresses into a web browser.


    EdinaMN.gov/Highway100Talks

    EdinaMN.gov/highway100talks

  • March 18, 2025 Update

    Share March 18, 2025 Update on Facebook Share March 18, 2025 Update on Twitter Share March 18, 2025 Update on Linkedin Email March 18, 2025 Update link

    A big milestone was completed on Thursday, March 13, construction bids were received. We received two bids for construction of the project. They were from Ames Construction at $22.06 million and C.S. McCrossan at $22.45 million. These were at the engineers estimate. The state is reviewing the required contracting paperwork. If everything meets the requirements, we will ask the City Council to award a contract on April 16. The schedule that was included in the bid documents required Vernon Ave and 50th Street to be re-opened to traffic by November 15, 2025. We are still discussing schedule with the contractor.

  • March 5, 2025 Update

    Share March 5, 2025 Update on Facebook Share March 5, 2025 Update on Twitter Share March 5, 2025 Update on Linkedin Email March 5, 2025 Update link

    The City Council awarded a tree removal contract last night. Removals are tentatively planned for the last two weeks of March. Due to the delay caused by CPKS Railroad in signing an easement agreement, a separate contract for tree removals is required. The trees need to be removed before March 31. This contract will remove all the necessary trees to make space for the new bridges, highway interchange and noise walls. The highway interchange project is out to bid now with an anticipated award date of April 16. Trees are located along Highway 100 near City Hall, adjacent to the northbound Highway 100 on-ramp, around both the Highway 100 and Vernon Ave bridges and near CPKC Railroad tracks. A copy of the tree removal plans is posted to the documents area of this website. Thanks, Chad Millner, City Engineer

  • February 27, 2025 Update

    Share February 27, 2025 Update on Facebook Share February 27, 2025 Update on Twitter Share February 27, 2025 Update on Linkedin Email February 27, 2025 Update link

    Due to the delay caused by CPKS Railroad in signing an easement agreement, a separate contract for tree removals is required. The trees need to be removed before March 31 to ensure no protected species have nested yet. This contract will remove all the necessary trees to make space for the new bridges, highway interchange and noise walls. The highway interchange project is out to bid now with an anticipated award date of April 16. Trees are located along Highway 100 near City Hall, adjacent to the northbound Highway 100 on-ramp, around both the Highway 100 and Vernon Ave bridges and near CPKC Railroad tracks. Council will consider awarding this contract on March 4. Work will start soon afterwards. Thanks

Page last updated: 29 Apr 2025, 09:31 AM