Morningside D & E Neighborhood Roadway Reconstruction
Morningside D & E Neighborhood Roadway Reconstruction updates will be hosted on this project page. Check back for updates!
This project began construction in 2022 and will continue in 2023. The work includes:
- Complete reconstruction of the asphalt pavement,
- Full replacement of concrete curb and gutter and sidewalk,
- Replacement of fire hydrants and watermain gate valves. The project will also include new water services between the main in the street and the property’s shut-off valve (curb stop),
- Improvements to the sanitary sewer and storm sewer systems, including flood risk reduction improvements, and
- Assessments to property owners for the roadway project costs, at $8,338.95 per residential equivalent unit
Morningside D & E Neighborhood Roadway Reconstruction updates will be hosted on this project page. Check back for updates!
This project began construction in 2022 and will continue in 2023. The work includes:
- Complete reconstruction of the asphalt pavement,
- Full replacement of concrete curb and gutter and sidewalk,
- Replacement of fire hydrants and watermain gate valves. The project will also include new water services between the main in the street and the property’s shut-off valve (curb stop),
- Improvements to the sanitary sewer and storm sewer systems, including flood risk reduction improvements, and
- Assessments to property owners for the roadway project costs, at $8,338.95 per residential equivalent unit
-
Oakdale Avenue Street Width South of Branson Street
Share Oakdale Avenue Street Width South of Branson Street on Facebook Share Oakdale Avenue Street Width South of Branson Street on Twitter Share Oakdale Avenue Street Width South of Branson Street on Linkedin Email Oakdale Avenue Street Width South of Branson Street linkOakdale Avenue between Branson Street and the dead-end south of Branson Street will be a 24-feet wide street with parking on only the west side of Oakdale Avenue.
Thank you to those that responded to the questionnaire. 8 out of 9 returned questionnaires preferred this option over the 27-feet wide street with parking on both sides option.
-
Project Update - City Council Authorization
Share Project Update - City Council Authorization on Facebook Share Project Update - City Council Authorization on Twitter Share Project Update - City Council Authorization on Linkedin Email Project Update - City Council Authorization linkThe City Council authorized the design and contractor bidding phase for the project on December 21. Preparation of final plans and specifications will be prepared this winter, followed by solicitation of contractor bids. We anticipate construction beginning in April or May 2022. The estimated preliminary assessment amount is $9,300 per residential equivalent unit, payable beginning in 2023 after construction is complete.
-
Estimated Assessment & Engineering Study
Share Estimated Assessment & Engineering Study on Facebook Share Estimated Assessment & Engineering Study on Twitter Share Estimated Assessment & Engineering Study on Linkedin Email Estimated Assessment & Engineering Study linkThe City hired Nagell Appraisal Inc. to prepare a letter report providing a preliminary opinion of market benefit for similar properties in the neighborhood. The letter report is available for viewing in the document library located here. The estimated assessment amount per residential equivalent unit (REU) is $9,300.
The Engineering Study can be viewed here.
-
Public Hearing - Dec 13, 2021
Share Public Hearing - Dec 13, 2021 on Facebook Share Public Hearing - Dec 13, 2021 on Twitter Share Public Hearing - Dec 13, 2021 on Linkedin Email Public Hearing - Dec 13, 2021 linkTo complete the public hearing comment form please click here.
The Edina City Council will meet at Edina City Hall on Monday, Dec. 13, 2021, at 6:00 p.m., to consider the public hearing on roadway improvements for Morningside D & E Neighborhood Roadway Reconstruction. This hearing is being conducted under the authority granted by Minnesota Statutes, Chapter 429.
This hearing has been called as a recommendation from staff. The proposed project would be constructed in the summer of 2022 with the assessment hearing occurring in the fall of 2023. The estimated cost is $2,285,103.00 and is funded by special assessment. The estimated cost per assessable lot is $9,300.00 per residential equivalent unit. The assessment can be divided over a fifteen-year period with interest accumulating on the unpaid balance.
The area proposed to be assessed the cost of the proposed improvement includes the following:
4200 to 4504 West 42nd Street, 4022 and 4100 West 44th Street, 4200 to 4411 Branson Street, 4206 to 4249 Crocker Avenue, 4201 to 4324 Grimes Avenue, 4125 Kipling Avenue, 4401 Littel Street, 4200 to 4247 Lynn Avenue, 4114 to 4501 Morningside Rd, 4200 to 4370 Oakdale Avenue, 4245 and 4248 Sidell Trail
-
Informational Video Presentation - Roadway Improvements
Share Informational Video Presentation - Roadway Improvements on Facebook Share Informational Video Presentation - Roadway Improvements on Twitter Share Informational Video Presentation - Roadway Improvements on Linkedin Email Informational Video Presentation - Roadway Improvements linkPlease watch the informational videos about how projects are funded (special assessment and utility funds), a typical project timeline, how you will be impacted, how you can prepare, and more. Please also complete the online survey on whether you would attend a neighborhood wide in person Q&A meeting at a City facility. If favorable results are received, a meeting would occur in November.
We hope you find these videos informative, and we anticipate they will generate questions. Your questions can be submitted on this web page, or you can reach out to us by email or phone.
-
Welcome!
Share Welcome! on Facebook Share Welcome! on Twitter Share Welcome! on Linkedin Email Welcome! linkHello and welcome to Better Together Edina. This web page will be the hub for sharing information related to roadway reconstruction scheduled for 2022 in the Morningside D & E neighborhood. Important updates will be posted on this web page at various points during the Engineering Study phase. Anticipate weekly updates during construction in 2022. Key project milestones include:
- June 2021 – Begin Engineering Study preparation
- Summer 2021 – Informational video or similar. Format to be determined due to COVID-19
- Nov. 2021 – Engineering Study complete
- Dec. 2021 – City Council meeting to discuss authorizing project design
- Mar. 2022 – City Council authorizes construction
- Apr. 2022 – Construction begins
- Oct. 2022 – Construction substantial completion
More information regarding flood risk reduction in the Morningside neighborhood can be found here.
Feel free to call or email me with your project questions, or you can post questions on this website.
We look forward to assisting and keeping you informed with this project.
Aaron Ditzler
Email Signup
Sign Up for Emailed Project Updates
PRIVACY NOTICE: Under M.S. 13.356, your email address is private data. If you do not provide an email address you will not receive requested updates. Your email address will be available to anyone with a work assignment that reasonably require access.
Who's Listening
-
Phone 701-354-5621 Email NBonanno@sehinc.com -
Phone 952-912-2633 Email kmanzke@sehinc.com -
Phone 952-826-0443 Email aditzler@EdinaMN.gov
Key Dates
-
April 2023
-
September 2023
-
May 11 2022
-
April 19 2022
Text Notifications
During the project there may be unexpected time sensitive resident impacts. In addition to providing those notices on the project page you may opt into receiving text notifications.
To sign up text MSIDE22 to 5-7-8-3-8.
Photos
Videos
Documents
-
Construction Kickoff Update and What To Expect (107 KB) (pdf)
-
Utility Upgrade Letter (938 KB) (pdf)
-
Morningside D_E Project Area Map (181 KB) (pdf)
-
Engineering Study Morningside D & E (24.8 MB) (pdf)
-
Estimated Market Benefit - Morningside (1.54 MB) (pdf)
-
September 26, 2019 Open House Presentation (6.11 MB) (pdf)
-
Living Streets Typical Section.pdf (885 KB) (pdf)
-
Pedestrian Facilities Master Plan.pdf (497 KB) (pdf)
-
Assessment History (102 KB) (pdf)