Southdale B Neighborhood Roadway Reconstruction

Share Southdale B Neighborhood Roadway Reconstruction on Facebook Share Southdale B Neighborhood Roadway Reconstruction on Twitter Share Southdale B Neighborhood Roadway Reconstruction on Linkedin Email Southdale B Neighborhood Roadway Reconstruction link

Southdale B Neighborhood Roadway Reconstruction updates will be hosted on this project page. Sign up for email updates!

This project, scheduled for construction in 2024, includes:

  • Complete reconstruction of the asphalt pavement,
  • Complete reconstruction of the concrete pavement with asphalt pavement,
  • Full installation or replacement of concrete curb and gutter,
  • Complete replacement of the majority of the watermain and water services,
  • Improvements to the sanitary sewer and storm sewer systems,
  • Complete replacement of the street lighting system, and
  • Construction of a concrete sidewalk along Barrie Road and a portion of West 65th Street and Heritage Drive to complete gaps in the pedestrian network.
  • A preliminary assessment amount of $950.00 per multi-family residential unit (condominium or apartment owner), was approved by the Council at the December 2023 public hearing. This $950.00 per REU amount has been recorded with Hennepin County as pending assessments for all impacted properties.

Southdale B Neighborhood Roadway Reconstruction updates will be hosted on this project page. Sign up for email updates!

This project, scheduled for construction in 2024, includes:

  • Complete reconstruction of the asphalt pavement,
  • Complete reconstruction of the concrete pavement with asphalt pavement,
  • Full installation or replacement of concrete curb and gutter,
  • Complete replacement of the majority of the watermain and water services,
  • Improvements to the sanitary sewer and storm sewer systems,
  • Complete replacement of the street lighting system, and
  • Construction of a concrete sidewalk along Barrie Road and a portion of West 65th Street and Heritage Drive to complete gaps in the pedestrian network.
  • A preliminary assessment amount of $950.00 per multi-family residential unit (condominium or apartment owner), was approved by the Council at the December 2023 public hearing. This $950.00 per REU amount has been recorded with Hennepin County as pending assessments for all impacted properties.
  • Contractor Watering Concludes - Property Owners Responsible for Sod Care Maintenance

    Share Contractor Watering Concludes - Property Owners Responsible for Sod Care Maintenance on Facebook Share Contractor Watering Concludes - Property Owners Responsible for Sod Care Maintenance on Twitter Share Contractor Watering Concludes - Property Owners Responsible for Sod Care Maintenance on Linkedin Email Contractor Watering Concludes - Property Owners Responsible for Sod Care Maintenance link

    The City has accepted the sod in the project area. Property owners are now responsible for watering and care of your new sod. The Contractor will no longer water the sod. This notification was emailed to property owners with further instructions.


    To help the new sod take root and stay healthy, your assistance is needed.

    • We recommend giving your lawn one inch of water per week, spread out over three watering applications (one-third inch during each application).
    • Lighter waterings are not desirable, as they encourage shallow roots instead of deep roots.
    • Lawns need deep roots to help them withstand periods of little or no rain.
    • The roots of new sod require about one year to reach their full length.
    • Set the mower deck at the highest setting and cut the new sod with this setting for the first year. Your new sod will die if you cut it at the same setting as the one you ordinarily use to cut your mature lawn and the City will not replace it.
    • Healthy grass height for established lawns is around three inches.
    • Please see this short video for recommendations.
  • Substantial Completion

    Share Substantial Completion on Facebook Share Substantial Completion on Twitter Share Substantial Completion on Linkedin Email Substantial Completion link

    The Southdale B Street Reconstruction project is substantially complete. The contractor will address the following remaining items in the summer of 2025 as part of final completion.


    • Roadway striping on W 65th Street and Barrie Road.
    • Watering of sod on W 65th Street will continue for a short period. Following acceptance of the sod in fall 2025, property owners will be responsible for the new sod.
    • Remaining Irrigation repairs as needed.
    • Warranty repairs (2025/2026)


    The City of Edina and New Look Contracting thank you for your patience and cooperation throughout the 2024 and 2025 construction seasons.


  • Construction Update - 6/12/2025

    Share Construction Update - 6/12/2025 on Facebook Share Construction Update - 6/12/2025 on Twitter Share Construction Update - 6/12/2025 on Linkedin Email Construction Update - 6/12/2025 link

    Traffic Update

    • The following roads will remain CLOSED on Fri. 6/13 due to asphalt paving.
      • The intersection of Barrie Road and W 65th Street
        • The intersection will open on Fri. 6/13 following the rollers completing the compaction.
      • W 65th Street between Drew Avenue and Barrie Road
      • Colony Way entrance from W 65th Street
        • Colony Way will be accessible from Barrie Road during this time.
    • This work is weather permitting. Paving will be rescheduled to Mon. 6/16 if it rains on Fri. 6/13.
    • A map visualizing this traffic update can be found here.


    W. 65th Street

    • Sign installation, saw and seal of the roadway, and pavement striping is scheduled for the week of 6/16.


    Barrie Road and Heritage Drive

    • Permanent pavement striping is scheduled for the week of 6/16


  • Construction Update – 5/30/2025

    Share Construction Update – 5/30/2025 on Facebook Share Construction Update – 5/30/2025 on Twitter Share Construction Update – 5/30/2025 on Linkedin Email Construction Update – 5/30/2025 link

    Traffic Update

    • Expect some short term delays on Barrie Rd and Heritage Drive due to warranty related repairs.
    • There will be another W 65th Street closure in mid June when the final layer of asphalt paving occurs.


    W. 65th Street

    • Streetlight installation, retaining wall installation, and topsoil installation will continue into the week of 6/2.
    • Sod installation is scheduled for week of 6/9.
    • Construction is scheduled to conclude by the end of June.


    Barrie Road and Heritage Drive

    • Cracked sidewalk panels will be removed and replaced the week of 6/2.


  • Construction Update - 5/23/2025

    Share Construction Update - 5/23/2025 on Facebook Share Construction Update - 5/23/2025 on Twitter Share Construction Update - 5/23/2025 on Linkedin Email Construction Update - 5/23/2025 link

    Traffic Update

    • W 65th Street between Drew Avenue and Barrie Road is now open to traffic.
    • There will be another W 65th Street closure in June when the final layer of asphalt paving occurs.


    W. 65th Street

    • Paving the first layer of asphalt is complete.
    • Irrigation repairs and streetlight and retaining wall installations are scheduled to begin the week of 5/26. Topsoil and sod will follow after this work is complete, and the final layer of asphalt will follow the topsoil and sod work.
    • Construction is scheduled to conclude by the end of June.


    Metro Transit

    • Route 578 bus service to and from Downtown Minneapolis has resumed on Barrie Road and Heritage Drive.
      • Please note that southbound buses coming from Downtown Minneapolis will NOT be servicing stops on Drew Ave and W 65th Street due to construction on W 65th Street.


  • Construction Update - 5/16/2025

    Share Construction Update - 5/16/2025 on Facebook Share Construction Update - 5/16/2025 on Twitter Share Construction Update - 5/16/2025 on Linkedin Email Construction Update - 5/16/2025 link

    Traffic Update

    • Expect short term delays driving at the intersection of Barrie Road & W 65th Street due to asphalt paving. Please plan your trips to account for this short-term delays, which is anticipated during the middle of the week of 5/19.
    • The following roads will remain CLOSED during the week of 5/19 due to asphalt paving.
      • W 65th Street between Drew Avenue and Barrie Road
      • Colony Way entrance from W 65th Street
        • Colony Way will be accessible from Barrie Road during this time.
    • A map visualizing this traffic update can be found here.


    W. 65th Street

    • Paving the first layer of asphalt is scheduled for the week of 5/19.
    • Streetlight installation is scheduled to begin the week of 5/19.


    Metro Transit

    • Route 578 bus service to and from Downtown Minneapolis has resumed on Barrie Road and Heritage Drive.
      • Please note that southbound buses coming from Downtown Minneapolis will NOT be servicing stops on Drew Ave and W 65th Street due to construction on W 65th Street.
    • Metro Transit’s E Line bus station construction is scheduled to be completed by the end of June 2025.
    • If you have any questions or concerns about Metro Transit’s E Line project, please email ELine@metrotransit.org or call 612-524-6050.


  • Construction Update – 5/9/2025

    Share Construction Update – 5/9/2025 on Facebook Share Construction Update – 5/9/2025 on Twitter Share Construction Update – 5/9/2025 on Linkedin Email Construction Update – 5/9/2025 link

    Traffic Update

    • The following roads will remain CLOSED during the week of 5/12 due to concrete sidewalk installation.
      1. W 65th Street between Drew Avenue and Barrie Road
      2. Colony Way entrance from W 65th Street
        • Colony Way will be accessible from Barrie Road during this time.
    • A map visualizing this traffic update can be found here.


    W. 65th Street

    • Concrete curb installation began.
    • Concrete driveway apron and sidewalk installation will begin on 5/9 and conclude early during the week of 5/12.
    • Streetlight installation is scheduled to begin the week of 5/12.
    • Paving the first layer of asphalt is scheduled for the week of 5/19.


    Metro Transit

    • Route 578 bus service to and from Downtown Minneapolis has resumed on Barrie Road and Heritage Drive.
      • Please note that southbound buses coming from Downtown Minneapolis will NOT be servicing stops on Drew Ave and W 65th Street due to construction on W 65th Street.
    • Metro Transit’s E Line bus station construction is scheduled to be completed by the end of June 2025.
    • If you have any questions or concerns about Metro Transit’s E Line project, please email ELine@metrotransit.org or call 612-524-6050.
    • You can sign up to receive email updates about the E Line construction here.


    https://public.govdelivery.com/accounts/MNORGMETC/subscriber/new?topic_id=MNORGMETC_643


  • Construction Update - 5/2/2025

    Share Construction Update - 5/2/2025 on Facebook Share Construction Update - 5/2/2025 on Twitter Share Construction Update - 5/2/2025 on Linkedin Email Construction Update - 5/2/2025 link

    Traffic Update

    • The following roads will remain CLOSED during the week of 5/5 due to road excavation and concrete curb installation.
      • The intersection of Barrie Road and W 65th Street
      • W 65th Street between Drew Avenue and Barrie Road
      • Colony Way entrance from W 65th Street
        • Colony Way will be accessible from Barrie Road during this time.
    • A map visualizing this traffic update can be found here.
    • The intersection of Barrie Road and W 65th Street is scheduled to reopen later during the week of 5/5, following completion of road excavation work.
    • W 65th Street between Drew Avenue and Barrie Road is scheduled to reopen temporarily later during the week of 5/5, following completion of concrete curb.


    Metro Transit

    • Metro Transit’s bus station construction is scheduled to be completed by the end of June 2025.
    • If you have any questions or concerns about Metro Transit’s E Line project, please email ELine@metrotransit.org or call 612-524-6050.
    • You can sign up to receive email updates about the E Line construction here.


    https://public.govdelivery.com/accounts/MNORGMETC/subscriber/new?topic_id=MNORGMETC_643


  • Construction Update - 4/25/2025

    Share Construction Update - 4/25/2025 on Facebook Share Construction Update - 4/25/2025 on Twitter Share Construction Update - 4/25/2025 on Linkedin Email Construction Update - 4/25/2025 link

    Traffic Update

    • The following roads will remain CLOSED during the week of 4/28 due to sanitary sewer improvements.
      • The intersection of Barrie Road and W 65th Street
      • W 65th Street between Drew Avenue and Barrie Road
      • Colony Way entrance from W 65th Street
        • Colony Way will be accessible from Barrie Road during this time.
    • A map visualizing this traffic update can be found here.
    • The intersection of Barrie Road and W 65th Street is tentatively scheduled to reopen by 5/2 following the completion of sanitary sewer improvements.
    • W 65th Street between Drew Avenue and Barrie Road will remain closed following the completion of sanitary sewer improvements due to storm sewer improvements.


    Metro Transit

    • Metro Transit’s bus station construction is scheduled to be completed by the end of June 2025.
    • If you have any questions or concerns about Metro Transit’s E Line project, please email ELine@metrotransit.org or call 612-524-6050.
    • You can sign up to receive email updates about the E Line construction here.

    https://public.govdelivery.com/accounts/MNORGMETC/subscriber/new?topic_id=MNORGMETC_643

  • Construction Update - 4/10/25

    Share Construction Update - 4/10/25 on Facebook Share Construction Update - 4/10/25 on Twitter Share Construction Update - 4/10/25 on Linkedin Email Construction Update - 4/10/25 link

    Construction on W 65th Street and Barrie Road is scheduled to resume on Monday, 4/14 and be substantially completed by 6/30. The W 65th Street work will begin with asphalt pavement removal, followed by sanitary sewer improvements.

    Traffic Update

    • The following roads will be CLOSED beginning on Monday, 4/14 due to sanitary sewer improvements.
      1. The intersection of Barrie Road and W 65th Street
      2. W 65th Street between Drew Avenue and Barrie Road
      3. Colony Way entrance from W 65thStreet
        • Colony Way will be accessible from Barrie Road during this time.
    • A map visualizing this traffic update can be found here.
    • The intersection of Barrie Road and W 65th Street will be closed for a minimum of 2 weeks.

    Metro Transit

    • Metro Transit is currently constructing a new bus rapid transit station for the new E Line on W 65th Street between France Avenue and Drew Avenue in front of Southdale Hospital.
    • This project is NOT part of the City’s Southdale B road reconstruction project on W 65th Street.
    • The bus station construction is scheduled to be completed by the end of June 2025.
    • If you have any questions or concerns about Metro Transit’s E Line project, please email ELine@metrotransit.org or call 612-524-6050.
    • You can sign up to receive email updates about the E Line construction here.
Page last updated: 28 Jul 2025, 09:49 AM