Southdale B Neighborhood Roadway Reconstruction
Southdale B Neighborhood Roadway Reconstruction updates will be hosted on this project page. Sign up for email updates!
This project, scheduled for construction in 2024, includes:
- Complete reconstruction of the asphalt pavement,
- Complete reconstruction of the concrete pavement with asphalt pavement,
- Full installation or replacement of concrete curb and gutter,
- Complete replacement of the majority of the watermain and water services,
- Improvements to the sanitary sewer and storm sewer systems,
- Complete replacement of the street lighting system, and
- Construction of a concrete sidewalk along Barrie Road and a portion of West 65th Street and Heritage Drive to complete gaps in the pedestrian network.
- A preliminary assessment amount of $950.00 per multi-family residential unit (condominium or apartment owner), was approved by the Council at the December 2023 public hearing. This $950.00 per REU amount has been recorded with Hennepin County as pending assessments for all impacted properties.
Southdale B Neighborhood Roadway Reconstruction updates will be hosted on this project page. Sign up for email updates!
This project, scheduled for construction in 2024, includes:
- Complete reconstruction of the asphalt pavement,
- Complete reconstruction of the concrete pavement with asphalt pavement,
- Full installation or replacement of concrete curb and gutter,
- Complete replacement of the majority of the watermain and water services,
- Improvements to the sanitary sewer and storm sewer systems,
- Complete replacement of the street lighting system, and
- Construction of a concrete sidewalk along Barrie Road and a portion of West 65th Street and Heritage Drive to complete gaps in the pedestrian network.
- A preliminary assessment amount of $950.00 per multi-family residential unit (condominium or apartment owner), was approved by the Council at the December 2023 public hearing. This $950.00 per REU amount has been recorded with Hennepin County as pending assessments for all impacted properties.
-
Construction Update – 10/18/2024
Share Construction Update – 10/18/2024 on Facebook Share Construction Update – 10/18/2024 on Twitter Share Construction Update – 10/18/2024 on Linkedin Email Construction Update – 10/18/2024 linkTraffic Update
- Access to Xerxes Avenue from Heritage Drive will remain closed until Monday morning 10/21.
- Access to Xerxes Avenue will be via York Avenue and W 64th Street.
- A map visualizing this traffic update can be found here.
- Although the first layer of asphalt is complete on the majority of Barrie Road and on Heritage Drive, no parking remains in effect. Please do not park on the street during working hours. You may get towed. This will give the contractor the proper space to do work. Thank you for your cooperation.
Barrie Road
- Sod installation is scheduled to begin the week of 10/21.
- Retaining wall installation is scheduled to begin the week of 10/21.
Heritage Drive
- Sod installation is scheduled to begin the week of 10/21.
W. 65th Street
- Xcel Energy’s relocation of their facilities is scheduled to resume the week of 10/21. Sorry for the delay.
- While the street is gravel, it is open to vehicular traffic. Please drive slowly.
- Access to Xerxes Avenue from Heritage Drive will remain closed until Monday morning 10/21.
-
Road Closed at Heritage Drive & Xerxes Ave 10/16-10/20
Share Road Closed at Heritage Drive & Xerxes Ave 10/16-10/20 on Facebook Share Road Closed at Heritage Drive & Xerxes Ave 10/16-10/20 on Twitter Share Road Closed at Heritage Drive & Xerxes Ave 10/16-10/20 on Linkedin Email Road Closed at Heritage Drive & Xerxes Ave 10/16-10/20 linkTraffic Update
- Access to Xerxes Avenue from Heritage Drive will be closed starting 10/16 and will likely last through 10/20 due to concrete valley gutter installation.
- During this road closure, access to Xerxes Avenue will be via York Ave and W 64th Street.
- Excessive vehicle speeds are prevalent in the project area, so please slow down. We encourage safety for both you AND the construction crew.
- A map visualizing this traffic update can be found here.
-
Construction Update - 10/11/2024
Share Construction Update - 10/11/2024 on Facebook Share Construction Update - 10/11/2024 on Twitter Share Construction Update - 10/11/2024 on Linkedin Email Construction Update - 10/11/2024 linkAlthough the first layer of asphalt is complete on the majority of Barrie Road and on Heritage Drive, no parking remains in effect. Please do not park on the street during working hours. You may get towed. This will give the contractor the proper space to do work. Thank you for your cooperation.
Barrie Road
- Concrete sidewalk installation is expected to resume the week of 10/14. The remaining handful of concrete driveway apron will occur the week of 10/14 as well.
- Irrigation repairs are scheduled to continue into the week of 10/14.
- Streetlight installation is scheduled to continue into the week of 10/14.
- Topsoil installation is scheduled to continue into the week of 10/14.
- Sign installation is scheduled to begin the week of 10/14.
- Sod installation is scheduled to begin the week of 10/21.
Heritage Drive
- Sign installation is scheduled to begin the week of 10/14.
- Sod installation is scheduled to begin the week of 10/21.
W. 65th Street
- Xcel Energy’s relocation of their facilities has been delayed. Sorry for the delay.
- While the street is gravel, it is open to vehicular traffic. Please drive slowly.
-
Construction Update - 10/4/2024
Share Construction Update - 10/4/2024 on Facebook Share Construction Update - 10/4/2024 on Twitter Share Construction Update - 10/4/2024 on Linkedin Email Construction Update - 10/4/2024 linkAlthough the first layer of asphalt is complete on the majority of Barrie Road and on Heritage Drive, no parking remains in effect. Please do not park on the street during working hours. You may get towed. This will give the contractor the proper space to do work. Thank you for your cooperation.
Barrie Road
- Concrete sidewalk installation is expected to resume the week of 10/7. The remaining handful of concrete driveway apron will occur the week of 10/7 as well.
- Irrigation repairs are scheduled to continue into the week of 10/7.
- Streetlight installation is scheduled to begin the week of 10/7.
Heritage Drive
- Topsoil installation is scheduled to begin the week of 10/7.
W. 65th Street
- Xcel Energy’s relocation of their facilities has been delayed. Sorry for the delay.
- While the street is gravel, it is open to vehicular traffic. Please drive slowly.
-
Asphalt Paving on Barrie Rd - 10/4/2024
Share Asphalt Paving on Barrie Rd - 10/4/2024 on Facebook Share Asphalt Paving on Barrie Rd - 10/4/2024 on Twitter Share Asphalt Paving on Barrie Rd - 10/4/2024 on Linkedin Email Asphalt Paving on Barrie Rd - 10/4/2024 linkAccess to Barrie Road from W 66th Street and Heritage Drive will be closed on Friday, 10/4 due to paving the first layer of asphalt on Barrie Rd. This is anticipated to begin at 7 AM.
- The daytime road closure is anticipated to one day.
- Barrie Road will be accessible from W 65th Street during this time.
- Expect short term delays driving on Barrie Road between W 66th Street and Heritage Drive.
- Delays accessing Barrie Road from properties can be up to 15 minutes due to paving.
- Please plan your trips to account for these short-term delays.
- As soon as the large rollers are done compacting the pavement, vehicles can access Barrie Road.
- A map visualizing this traffic update can be found here.
-
Construction Update - 9/27/2024
Share Construction Update - 9/27/2024 on Facebook Share Construction Update - 9/27/2024 on Twitter Share Construction Update - 9/27/2024 on Linkedin Email Construction Update - 9/27/2024 linkTraffic Update
- Expect short term delays driving on Barrie Road between W 66th Street and Heritage Drive late during the week of 9/30 or during the week of 10/7 due to asphalt paving. Please plan your trips to account for these short-term delays.
- Access to Barrie Road from W 66th Street and Heritage Drive will be closed during asphalt paving. The daytime closure is anticipated to one day. Barrie Road will be accessible from W 65th Street during this time.
- Excessive vehicle speeds are prevalent in the project area, so please slow down. We encourage safety for both you AND the construction crew.
- A map visualizing this traffic update can be found here.
Barrie Road
- Driveway apron and concrete sidewalk installation will continue into week of 9/30.
- The first layer of asphalt paving is scheduled to begin late during the week of 9/30 or during the week of 10/7 following driveway apron installation.
- Delays accessing Barrie Road from properties can be up to 15 minutes due to paving.
- As soon as the large rollers are done compacting the pavement, vehicles can access Barrie Road.
Heritage Drive
- Tree replacement planting is scheduled to begin week of 9/30.
- Although the first layer of asphalt is complete, no parking remains in effect on Heritage Drive.
W. 65th Street
- Xcel Energy’s relocation of their facilities has been delayed. Sorry for the delay.
- While the street is gravel, it is open to vehicular traffic. Please drive slowly.
-
Construction Update - 9/20/2024
Share Construction Update - 9/20/2024 on Facebook Share Construction Update - 9/20/2024 on Twitter Share Construction Update - 9/20/2024 on Linkedin Email Construction Update - 9/20/2024 linkBarrie Road
- Driveway aprons and concrete sidewalk installation is scheduled to begin the week of 9/23 and conclude the week of 9/30.
Heritage Drive
- Irrigation repairs will continue into week of 9/23.
- Although the first layer of asphalt is complete, no parking remains in effect on Heritage Drive.
W. 65th Street
- Xcel Energy’s relocation of their facilities is scheduled to continue into the week of 9/23.
- While the street is gravel, it is open to vehicular traffic. Please drive slowly.
-
Construction Update - 9/13/2024
Share Construction Update - 9/13/2024 on Facebook Share Construction Update - 9/13/2024 on Twitter Share Construction Update - 9/13/2024 on Linkedin Email Construction Update - 9/13/2024 linkConstruction Update – 9/13/2024
Traffic Update
- Expect short term delays driving on Barrie Road between W 66th Street and Heritage Drive during the week of 9/16 due to curb installation. Please plan your trips to account for these short-term delays.
- Excessive vehicle speeds are prevalent in the project area, so please slow down. We encourage safety for both you AND the construction crew.
- A map visualizing this traffic update can be found here.
Barrie Road
- Roadway excavation is complete.
- Curb installation is scheduled for late during the week of 9/16.
Heritage Drive
- Irrigation repairs will continue into week of 9/16.
- Although the first layer of asphalt is complete, no parking remains in effect on Heritage Drive.
W. 65th Street
- While the street is gravel, it is open to vehicular traffic. Please drive slowly.
- Xcel Energy’s relocation of their facilities is scheduled to begin mid-September. Sorry for the delay.
-
Construction Update - 9/6/2024
Share Construction Update - 9/6/2024 on Facebook Share Construction Update - 9/6/2024 on Twitter Share Construction Update - 9/6/2024 on Linkedin Email Construction Update - 9/6/2024 linkTraffic Update
- Expect short term delays driving on Barrie Road between W 65th Street and Heritage Drive during the week of 9/9. These delays will include closures to excavate for the road. Please plan your trips to account for these short-term delays.
- Access to properties along Barrie Road between W 65th Street and Heritage Drive will have delays that may be up to 30 minutes. If that is too long of a delay, please refer to map for parking options.
- Residents of The Colony at Edina with only one driveway access within the road excavation area are encouraged to park on Barrie Road in the yellow areas on the map or be patient with the construction crews.
- Excessive vehicle speeds are prevalent in the project area, so please slow down. We encourage safety for both you AND the construction crew.
- A map visualizing this traffic update can be found here.
Barrie Road
- Roadway excavation will continue into the week of 9/9 between W 65th Street and Heritage Drive.
- Curb installation is scheduled for week of 9/16.
Heritage Drive
- Irrigation repairs and retaining wall installation is scheduled for the week of 9/9.
- Although the first layer of asphalt is complete, no parking remains in effect on Heritage Drive.
W. 65th Street
- While the street is gravel, it is open to vehicular traffic. Please drive slowly.
- Xcel Energy’s relocation of their facilities is scheduled to begin mid-September. Sorry for the delay.
-
Construction Update - 9/5/2024
Share Construction Update - 9/5/2024 on Facebook Share Construction Update - 9/5/2024 on Twitter Share Construction Update - 9/5/2024 on Linkedin Email Construction Update - 9/5/2024 linkTraffic Update
- Expect short term delays driving on Barrie Road between W 66th Street and Heritage Drive. These delays will include closures to excavate for the road. Please plan your trips to account for these short-term delays.
- Access to properties along Barrie Road between W 65th Street and Heritage Drive will have delays that may be up to 30 minutes. If that is too long of a delay, please refer to map for parking options.
- Residents of The Colony at Edina with only one driveway access within the road excavation area are encouraged to park on Barrie Road in the yellow areas on the map, or be patient with the construction crews.
- One of the Edina Towers driveways will be open and the other will be closed during the excavation work. Residents of Edina Towers will need to be aware and use the open driveway while the other is closed.
- Excessive vehicle speeds are prevalent in the project area, so please slow down. We encourage safety for both you AND the construction crew.
- A map visualizing this traffic update can be found here.
Email Signup
Sign Up for Emailed Project Updates
PRIVACY NOTICE: Under M.S. 13.356, your email address is private data. If you do not provide an email address you will not receive requested updates. Your email address will be available to anyone with a work assignment that reasonably require access.
Who's Listening
-
Phone 952-826-0444 Email CMoore@EdinaMN.gov -
Phone 952-826-0443 Email aditzler@EdinaMN.gov
Text Notifications
During the project there may be unexpected time sensitive resident impacts. In addition to providing those notices on the project page you may opt into receiving text notifications.
To sign up text SOUTHDALE to 844-929-4328 .
Key Dates
-
May 13 2024
-
May 07 2024
-
December 19 2023
-
December 11 2023
Photos
Videos
Documents
-
Southdale B Project Area (144 KB) (pdf)
-
Video Presentation Slides - 2024 Projects (10 MB) (pdf)
-
Pedestrian Facilities Master Plan (1.98 MB) (pdf)
-
Bicycle Facilities Master Plan (1.96 MB) (pdf)
-
Estimated Market Benefit - Southdale B (3.06 MB) (pdf)
-
Assessment History (101 KB) (pdf)
-
Living Streets Typical Section.pdf (885 KB) (pdf)
-
Proposed Roadway, Parking, and Sidewalk Details (1.94 MB) (pdf)
-
Southdale B Engineering Study (10.3 MB) (pdf)
-
Southdale B - Estimated Market Benefit (3.06 MB) (pdf)
-
Southdale B Project Start Letter.docx (1 MB) (docx)
-
Road Status Map Apr 25 2025 (1.17 MB) (pdf)
-
Southdale B Construction FAQ.pdf (299 KB) (pdf)
-
Sod Care Tips (68.1 KB) (docx)
-
CIPP Lining Door Hanger (74.5 KB) (pdf)
-
CIPP Lining Odor flyer (230 KB) (pdf)